My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06378
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:22:30 PM
Creation date
10/12/2006 1:35:46 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.200.05.P
Description
Hoover Dam/Lake Mead/Boulder Canyon Project
Basin
Colorado Mainstem
Date
5/2/1979
Author
USACOE
Title
Transcript of a Public Hearing for Re-evaluation of A Flood Control Operation Plan for Hoover Dam: Parker AZ
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />C,J <br />~ I' <br />ct) il <br />c.~ <br />c 1\ <br />...,I I <br /> I. <br /> I <br /> ) !I <br /> d " <br /> :i <br /> !! <br /> " <br /> II <br /> , <br /> , , , <br /> :1 <br /> ': <br /> " ,; <br /> I <br /> " <br /> i' <br /> i.'. <br /> <br />:1 <br /> <br /> " <br /> I !: <br /> l' :1 <br /> " ;, <br />r " , <br /> : <br />- <br /> I J :! <br /> Ii <br /> I' <br /> - I <br /> !" <br /> r: <br /> i(1 <br /> it' <br /> I '. <br /> <br />1'! <br /> <br />.:1) <br /> <br />", <br /> <br />'J" <br />-' <br /> <br />:':1 i <br /> <br />- <br /> <br />~,) <br /> <br />. <br /> <br />. <br /> <br />41 <br /> <br />the article stated? <br /> <br />PRESIDING OFFICER: Okay, I'm going to stumble <br /> <br />on this and when I stumble Bob over here from the Bureau <br /> <br />will pick me up on it since they're making the release. It's <br /> <br />my understanding, though, that the releases will probably <br /> <br />be somewhere between a thousand (1,000), eleven hundred <br /> <br />. <br /> <br />(1,000) cubic-feet-per-second. <br /> <br />MR. MASON: To start. <br /> <br />PRESIDING OFFICER: To start. <br /> <br />HR. BRANTINGllAH: So we're going to build up <br /> <br />as that time period -- <br /> <br />PRESIDING OFFICER: Up to a release possibly <br /> <br />of, what was it? <br /> <br />MR. ~~SON: Our plan here is to release water <br /> <br />so we can also generate power at the power plant down near <br /> <br />the Yuma area. We will start off with a flow of about <br /> <br />eleven hundred (1,100). I think you will get about a <br /> <br />thousand (1000) at that power plant. We will then after <br /> <br />two (2) or three (3) days go up five hundred (500) ,cubic-feet <br /> <br />per-second and we'll continue that again for two (2) or <br /> <br />three (3) days. Eventually we'll get up to about twenty-six <br /> <br />hundred (2,600) cubic-feet-per-second. Now this is an <br /> <br />increase over what we have been delivering. However, it's <br /> <br />about the same flow that we had a year ago. <br /> <br />MR. BRANTINGHAM: So that's basically a <br />
The URL can be used to link to this page
Your browser does not support the video tag.