Laserfiche WebLink
<br />xiii <br /> <br /> <br />002658 <br /> <br />FIGURES {Continued} <br /> <br />33. Recreation navigation base plan response to needs for <br />small boat facilities . . . . . . . . . <br /> <br />Page <br /> <br />34. Recreation navigation installation cost. . . . . . . . . <br />35. Recreation navigation operation and maintenance cost <br />36. Timber demand and production . . . <br />37. Land needs for crop production . . . <br />38. Fish and wildlife water requirements. <br />39. Fish and wildlife land requirements . <br />40. Fish and wildlife installation and water augmentation costs . <br />41. Recreation development needs. . . . . .. ........ <br />42. Recreation land needs in addition to those available in 1965. <br />43. Recreation surface water needs in addition to that available <br />In 1965 . . . . . . . . . . <br /> <br />80 <br />81 <br />81 <br />85 <br />89 <br />96 <br />97 <br />99 <br />103 <br />103 <br /> <br />44. Recreation resource capacity. . . . . . <br />45. Recreation land requirements . . . . . <br />46. Recreation surface water requirements. <br />47. Recreation installation cost . . . . . . <br />48. Recreation operation and maintenance annual costs. <br />49. Mineral development water requirements (depletions). <br />50. Mineral development land requirements . <br />51. Shoreline ownership (1965) . . . . . . . <br />52. Shoreline use (1965). . . . . . . . . . . <br />53. Recreation shoreline needs for base plan response. <br />54. Projected shoreline damage with planned shoreline program . <br />55. Shoreline protection installation cost . . . . . . . . . . . . <br />56. Shoreline program operation, maintenance and replacement costs. <br />57. Framework plan response to needs for water (depletion) <br />58. Water requirements base plan and OBERS. . . . . . . . <br /> <br />104 <br />105 <br />105 <br />105 <br />107 <br />107 <br />109 <br />109 <br />113 <br />113 <br />117 <br />118 <br />119 <br />119 <br />121 <br />136 <br />