Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />Plan Formulation <br />Mancos Valley Salinity Study <br /> <br />Alternative plans were developed to display a range of possible treatments <br />to the irrigated lands and delivery systems in the Valley. Thirty-four <br />irrigation systems were evaluated separately. <br /> <br />Plan 1 - Future Without Program <br /> <br />This alternative assumes that no salinity control program will be <br />implemented in the MancDs Valley. Other programs will continue as they have <br />operated in the past. This alternative is the bench mark that the effects <br />of other alternatives plan are measured from. <br /> <br />Plan 2 - On-Farm Treatment <br /> <br />This alternative assumes that a sprinkler system will be installed under the <br />following systems: Beaver, Boss, Carpenter and Mitchel. Doerfer, Exon, <br />Frank, Glasgow and Brewer, Henry Bolen, Mathews, No.6, Ratliff and Root, <br />Sheek, Smith,Webber, Willden and Brinkerhoff, and Willis Ditches. Of the <br />5,554 acres irrigated from these systems, on estimated 3,216 acres would be <br />converted to sprinklers. No treatment is recommended for other areas in the <br />valley. Cost of pumping was included in this alternative. <br /> <br />Plan 3 - Ditch Lining Only <br /> <br />This alternative assumes the delivery systems would be put into pipelines in <br />the ditch systems where this treatment is eCDnomically feasible. The <br />present ditch alignment would be used and gravity pressure would not be <br />saved. The following systems are included in this alternative: Beaver, <br />Boss, Frank, Henry Bolen, and Willis. No on-farm treatment was included in <br />this alternative. <br /> <br />~lan 4 - Combined System <br /> <br />This alternative assumes that the following fifteen systems: Beaver, Boss, <br />Carpenter and Mitchel, Doerfer, Exon, Frank, Glosgow and Brewer, Henry <br />Bolen, Mathews, No.6, Ratliff and Root, Sheek, Smith, Webber, and Willis <br />would be combined. A pressure pipeline would supply water to the 5,467 <br />acres under this systems. New sprinklers would be installed on 3,167 acres. <br />Gravity pressure will be supplied to all but about 100 acres under the pipe <br />system. <br /> <br />002295 <br />