My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06343
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06343
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:22:19 PM
Creation date
10/12/2006 1:34:35 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.124.A
Description
Pine River
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
1/1/1951
Author
USDOI Bureau of Recl
Title
Pine River Project Extension Colorado and New Mexico
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />SUMMARY--PINE RIVER ProJECT EXTENSION <br /> <br />LOCATION: Southwestern Colorado and northwestern New Mexico on Pine River, <br />about 20 miles east of Durango, Colo., Upper Colorado River Basin. <br /> <br />IRRIGATION WATER SUPPLY <br /> <br />Average annual supply <br />Stream depletion <br />Colorado <br />New Mexico <br />Total <br /> <br />45,450 acre-feet <br /> <br />ly,)lcO ~ at f.g? ::: <br />~':>o..c Iiil I 'f~ ::: <br /> <br />27 ,200 acre-feet <br />1.100 acre-feet <br />28,300 acre-feet <br /> <br />IRRIGATED ACREAGE <br /> <br />t,;:. <br />\ -,' <br /> <br />Land receiy:l,ng full water supply <br />Indian Y <br />Non-Ind:Lan <br />Total. <br /> <br />1,940 acres .. <br />13 . 210 acres <br />15,150 acres <br /> <br />1/ Includes SOIDS land in non-Indian ownership within bOWldaries of Pine River <br />Indian irrigation project. <br /> <br />~ <br /> <br />Construction cost (exclusive of $53,750 <br />of nonreimbursable money expended for <br />investigations and surveys from Colorado <br />River Development Fund) <br />Annual operation, DBintenance, and replace- <br />ment costs <br /> <br />$4,088,2$0 <br />$15,150 <br /> <br />ALLOCATIONS AND REPAYMENT <br /> <br />Construction Costs <br /> <br />Allocable to irrigation <br />Assigned to Indians <br />Payable by Indians or subject to adjustm~t <br />uDier an extension of the Leavitt Act Y <br />Assigned to non-Indians <br />pqab1e by non-Indian 'water users <br />Required from Upper Colorado River AccoWlt <br /> <br />$4,oss,250 <br />$522,250 <br /> <br />$211,Si,g <br />$3,566,000 <br />$1,441,798 <br />$2,434,604 <br /> <br />Annual Operation. Maintenance. and Replacement Costs <br /> <br />Allocable to irrigation <br />Assigned to Indians <br />Pqable by Indians or sub ject to adjust~1jt <br />uDier an extension of the Leavitt Act Y <br />Assigned to non-Indians <br />pqable by non-Indian water users <br /> <br />$15,150 <br />$1,940 <br /> <br />$1,940 <br />$13,210 <br />$13 , 210 <br /> <br />!I Act of July 1, 1932 (47 Stat. 564) authorizing th,e Secretary of the Interior <br />to adjust or e11lllinate reimbursable debts of Indians. <br /> <br />BENEFIT-GOST RATIO <br /> <br />1.85 to 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.