Laserfiche WebLink
<br />) <br /> <br />TABLE OF CONTENTS (Cont'd) <br /> <br />PARAGRAPH <br /> <br />III1t <br /> <br />PAGE NO. <br /> <br />3.3.4 Bank Protection <br />3.3.S Drainage Structures <br />3.3.6 Boat Chutes <br />3.4 Ownership of Major Features <br />3.4.1 Boat Chute <br />3.4.2 Union Avenue Weir (Station 366+4S) <br />3.4.3 Bed Grade Control Structure (Sta. 30S+00) <br />3.4.4 Littleton Flood Plain Park <br />3.4.S Hike/Bike Trails (908SA) <br />3.4.6 Property Easements <br />3. S History <br />3.6 As-Built Conditions <br /> <br />III.S <br />III.S <br />III.S <br />III.S <br />III-S <br />.III-S <br />III-6 <br />III-6 <br />III-6 <br />III-6 <br />1II-6 <br />III-7 <br /> <br />SECTION IV - TRAINING DIKES <br /> <br />4.1 Description <br />4.2 Training Dikes <br />4.3 Maintenance <br />4.4 Operation <br /> <br />IV-l <br />IV-l <br />IV-l <br />IV-3 <br /> <br />Checklist Dikes Exhibit IVa <br /> <br />SECTION V . CHANNELS AND FLOODWAYS <br /> <br />5.1 Description <br />5.2 Maintenance <br />5.2.1 Channels and Floodways <br />5.2.2 Riprap <br />S.3 Operation <br /> <br />V-I <br />V-I <br />V-I <br />V-2 <br />V-2 <br /> <br />Checklist Channels and Floodways Exhibit Va <br /> <br />SECTION VI - DRAINAGE STRUCTURES <br /> <br />6.1 Location VI.l <br />6.2 Description VI-l <br />6.3 Operation VI-l <br />6,4 Flap Gates VI-2 <br />6.4.1 Trash Hinders Operation VI-2 <br />6.5 Maintenance - General VI-2 <br />6.6 Painting VI - 3 <br />6.6.1 Preparation of Surfaces VI-3 <br />6.6.2 Cast Iron Flap Gates VI-4 <br />6.6.3 Coal Tar Paints for Cast.lron Flap Gates VI-4 <br />6.6.4 Steel Flap Gates VI-4 <br />6.6.5 Prime Coat and Aluminum Peints for Steel Flap Gates VI.4 <br />6.6.6 Application of Epoxy, Zinc Rich Galvanic Coating VI.4 <br />6.6.7 Epoxy, Zinc rich Galvanic Coating for Steel Flap Gates VI-5 <br /> <br />TC-2 <br />