My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06314
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06314
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:22:11 PM
Creation date
10/12/2006 1:33:24 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.114.J
Description
Dolores Participating Project
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
8/1/1987
Author
Dolores WCD
Title
DWCD Newsletter - August 1987
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />it, the District started <br />a comprehensive spraying <br />program along the length <br />of the Dove Creek Canal. <br />Positive results are now <br />visible. The disturbing <br />factor is that there are <br />several cases where land <br />adjacent to the canal is <br />infested. Therefore, regardless <br />of the best efforts of the <br />District the farmers fears <br />will be realized. A weed <br />control district should again <br />be considered. <br /> <br />CORTEZ MAKES FIRST PAYMENT <br />FOR PROJECT M&1 WATER <br /> <br />The City of Cortez recently <br />paid installment No 1 for <br />its share of Municipal Project <br />water. The payme.nt was for <br />$57,866, which entitles the <br />City to 640 acre feet. <br /> <br />I <br /> <br />CORTEZ & MVIC RECEIVE O&M <br />BLOCK NOTICES <br /> <br />In addition to repayment <br />for project water, both Cortez <br />and Montezuma Valley Irrigation <br />Company are to start paying <br />their share of the cost of <br />operating and maintaining <br />the proj ec t. That cost will <br />be $7,434 and $22,606 respect- <br />ively. <br /> <br />MCPHEE RESERVOIR FILLS FIRST <br />TIME <br /> <br />On June 23rd McPhee Reservoir <br />was declared full by the <br />Bureau of Reclamation. <br />That declaration ended a <br />four year filling process <br />that required that personnel <br />be on the structure 24 hours <br />a day 7 days a week while <br />the wa ter was rising. The <br />dam's status at the end of <br />the period was rated excellent. <br /> <br />DOLORES PROJECT <br /> <br />UPDATE <br />
The URL can be used to link to this page
Your browser does not support the video tag.