Laserfiche WebLink
<br />water per year for an annual total of 2,700 acre-feet. This would <br /> <br />re~uire utilization of BLM personnel and a BLv owned or leased drill <br /> <br />rig to drill 9 new artesian wells and improve the two existing pump <br /> <br />wells. Chis increased water supply wouM also BIlow utilization <br /> <br />of three fishpond-dike syatems which were built for the Rio Grande <br /> <br />Water Conservancy District's artesian test wells. These test wells <br /> <br />may never be drilled now, and the earthwork is useless without <br /> <br />water. <br /> <br />The proposed projects and the habitat which will result if the <br /> <br />Alternative II level of development is implemented are shown in <br /> <br />Figure 3. The svailability of water and the projected habitat <br /> <br />acreages are compiled in Table 5 for the aame Alternative. <br /> <br />) <br /> <br />, <br />j <br /> <br />-41- <br /> <br />_. <br /> <br />OC2737 <br /> <br />10123 <br />