Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />MEMORANDUM <br /> <br />COLORADO WATER CONSERVATION BOARD <br />DARIES C. LILE, P.E. <br />DlRECfOR <br /> <br />TO: <br /> <br />FROM: <br /> <br />Gene Jencsok, Peter Evans <br /> <br />Sue Uppendahl ~ <br />September 21, 1993 <br /> <br />DATE: <br /> <br />SUBJECT: <br /> <br />Directives from September 1993 CWCB Meeting <br /> <br />Following is a description of the tasks we were given by the Board on the endangered <br />fish Agenda Item 19a-e from the September 1993 Board meeting; <br /> <br />19a. Modifiable Flows - Have staff continue working with the FWS in developing <br />guidelines for "modifiable flows." To accomplish this, hold a meeting facilitated by <br />the University of Colorado - Denver with representatives from the CWCB, FWS, <br />Water Users and Environmental groups. <br /> <br />19b. Enforcement Aa:reement - CWCB authorized Director to execute this agreement with <br />the FWS. The signatory page is being prepared by the Attorney General's office, and <br />will be ready for signature by September 20, or 21, 1993. <br /> <br />19c. Record of Resolution for Applicability of Enforcement Agreement to 581 cfs <br />Appropriation for Instream Flow Protection in the 15 Mile Reach of the Colorado <br />River This resolution was approved by the CWCB and will be kept with the executed <br />copy of the Enforcement Agreement. No additional work on this item is required, <br />although a similar Record of Resolution will be necessary for any future appropriation <br />for the endangered fishes of the Upper Colorado River Basin. <br /> <br />1ge. .Joint Resolution with the ewCR and Colorado Wildlife Commission ewc for a <br />Native Aquatic Species Facility The CWCB approved this Joint Resolution with the <br />addition of Governor Romer to the list of names for copies to be sent to. This <br />change was made and sent to the CWC for approval. Upon approval by the CWC, <br />the CWCB Director and Chair will sign the Joint Resolution, anticipated to be <br />completed by September 24, 1993. <br /> <br />19d. Acquisition of absolute water ri2hts <br />19f. Critical Habitat Desi2l1ation - These Agenda Items were not discussed the September <br />1993 meeting due to the time frame. They will be discussed at a later meeting. <br /> <br />SZU /bj <br /> <br />bj1207.memo <br />