My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06255
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06255
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:21:56 PM
Creation date
10/12/2006 1:31:49 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.47.G
Description
Silt Project
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
1/1/1997
Author
USDOI/BOR
Title
Silt Project - Final Appraisal Report
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br />I <br />I <br />-I <br />I <br />I <br />I <br />I <br />, <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />.../ <br /> <br />PROCESS FOR SILT WATER OPERATIONS APPRAISAL STUDY <br /> <br />Step 1 - Meet with <br />individual interested <br />parties. <br /> <br />. n <br /> <br />Step 2 - Meeting to <br />discuss background, <br />problenv'needs, criteria <br /> <br />Step 3 - Work group <br />propose solutions, <br />identify concerns, <br /> <br />Step 4 - USBFVothers <br />analyze & evaluate <br />solutions. <br /> <br />Step 5 - Work Group <br />discuss analysis & <br />impacts, <br /> <br />Step 6 - USBR prepare <br />draft report. <br /> <br />Slep 7 - Work Group <br />review draft report; <br />provide comments. <br /> <br />Step 8 - USBR finalize <br />report & <br />recommendations. <br /> <br /> <br />Figure 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.