My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06255
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06255
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:21:56 PM
Creation date
10/12/2006 1:31:49 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.47.G
Description
Silt Project
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
1/1/1997
Author
USDOI/BOR
Title
Silt Project - Final Appraisal Report
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />l <br />I <br />I <br />I <br />I <br />, <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />, <br />I <br />I <br />I <br />I <br /> <br />Chapter 1 - Introduction <br /> <br />Study Purpose and Objectives <br /> <br />The purpose of the appraisal phase of the Silt Project Water Operations Study is <br />to review opportunities to enhance or improve project operation. Specific <br />objectives are to: <br />. identify problems, opportunities and needs which could be addressed by the <br />use of Silt Project facilities, <br />. identify, analyze; screen and prioritize options for addressing the problems, <br />opportunities and needs, and <br />. develop a report summarizing the findings of the appraisal phase and <br />providing recommendations for future activities, including possibly, more <br />detailed (feasibility-level! investigations. <br /> <br />Background and Study Process <br /> <br />In a 1990 letter to the Bureau of Reclamation (Reclamation!. the city of Rifle <br />expressed interest and support for a study to determine options to create, <br />preserve and enhance the recreational capabilities of Rifle Gap Reservoir (a <br />component of the Silt Project). Four potential options were suggested which <br />might serve to maximize the benefits occurring to the local economy as a result of <br />recreation at the reservoir. The City expressed a willingness to cooperate and to <br />consider participating financially in implementation of a plan. <br /> <br />Later in 1993, the Recovery Implementation Program for the Endangered Fish <br />Species in the Upper Colorado River Basin (RIP) draft Recovery Action Plan <br />identified the need to evaluate the Silt Project. The RIP was interested in <br />determining the potential for the project to provide a water supply to supplement <br />flows in the "15-Mile Reach" of the Colorado River at Grand Junction to help with <br />recovery of the fish. All Federally constructed water storage facilities in the upper <br />Colorado River basin above the 15-Mile reach are being examined for this <br />potential. <br /> <br />Initial Silt Project study efforts were begun in 1991 under Reclamation's <br />"Investigation of Existing Projects" funding authority, and later, with funding from <br />the RIP. However, significant efforts to fully examine the problems and needs <br />related to the project did not begin until mid-1995. Upon meeting with various <br />stakeholders, it was realized that focusing on operational changes to address only <br />recreation or endangered fish problems might not bring about the cooperation to <br />
The URL can be used to link to this page
Your browser does not support the video tag.