Laserfiche WebLink
<br />:....:-':.'..."'-'::.'.'::.:.. <br />..'.rnlM... <br />I'Nl:M <br />R-3 <br /> <br />Table 2 -- Analysis of Recreational Use Improvement Options <br /> <br /> <br />Extend boat ramp <br /> <br />R,4 <br /> <br />Buy water to store <br /> <br />R.5 <br /> <br />Transbasin <br />diversion from <br />White River <br /> <br />Extend existing boat ramp 60 <br />linear ft. (from a bottom elev. <br />of 5920.0 ft. M.S.L. down to <br />about elev. 5912). <br /> <br />Purchase non-Project water <br />rights from willing sellers; the <br />consumptive use of those <br />rights would be stored in RG <br />Reservoir. <br /> <br />Pump water about 10 miles <br />from the White River <br />mainstem to headwaters of <br />Rifle Cr.. or build 8 collection <br />system on higher elevation <br />White R. tributaries & pump <br />or use a tunnel to Rifle Cr. <br />(Since ability to obtain water <br />rights from headwaters is <br />unknown, this option <br />assumes pumping from <br />mainstem of the White <br />River. <br /> <br />..,..."... '" - -.. ., <br />1l~"iI~i"~II! <br /> <br />This extension would <br />allow boat launching for <br />an additional 16 - 46 <br />days based on historic <br />records of August <br />irrigation usage. <br /> <br />There are not many <br />rights avaUsble for <br />purchase. It would be <br />difficult or impossible to <br />assemble enough to <br />make up the several <br />thousand af needed. <br /> <br />Providing 10 cfs <br />pumping capacity would <br />yield 2000 af assuming <br />100 days of operation <br />annually. This 2000 af <br />would be stored in RG <br />Reservoir. <br /> <br /> <br />Possibly, the <br />effects of massive <br />land retirement <br />needed to acquire <br />sufficient water to <br />make a difference <br />in RG Reservoir <br /> <br />22 <br /> <br />For 60 Iinesr ft. <br />extension. about $9,800 <br />total. Therefore, 8 minor <br />annu81 east. <br /> <br />Initial cost per af could <br />range from $1,000 or <br />2,000 up to $10,000. <br />This would equate to $78 <br />to $780 per af per year. <br /> <br />- Est. construction cost = <br />$7,265,000 <br />. Annual pumping cost for <br />9.4 million kWh - <br />$509,000. <br />. Total annual cost <br />including O,M & R = <br />$1,132,000 or <br />$566/acre.ft./yr (for <br />2,000 af) <br /> <br />. Full reservoir (el. 5960) surface area is <br />359 acres. <br />. At bottom of exiating ramp leI. 5,9201, <br />the surface area is 179 ae. <br />. At elev. 5912, aree would be 144 ac. <br />- The quality of the experience & capacity <br />of RG Reservoir for recreational users <br />decreases as the water surface area <br />decreases. <br />- Boati safet is a concern. <br /> <br />- Purchasing large blocks of in-basin water <br />could have severe impacts on agriculture <br />and the local economy. <br />. Since most water rights are small, this <br />would require numerous court approved <br />change of use decrees. <br /> <br />. Total lift would be about 2,360 ft. <br />- Use 6 booster Ifft stations. <br />- Pipe length - 10 miles <br />. Assumed built on public land; no land <br />costs are included. <br />- New water right. would be needed lcost <br />is not included in estimate). <br />- Potential instream flow conflicts. <br />