My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06255
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06255
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:21:56 PM
Creation date
10/12/2006 1:31:49 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.47.G
Description
Silt Project
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
1/1/1997
Author
USDOI/BOR
Title
Silt Project - Final Appraisal Report
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Chapter 2 - Identification of Problems/Opportunities and Needs <br /> <br />i : <br />, , <br /> <br />The existing diversion has operational problems. The first problem arises from the <br />fact that the Colorado River channel has been scoured down several feet <br />(estimated to be three to four) since the mid 1960's when the project was <br />constructed. Grade control for the river channel was not included in the project <br />plan. In order to continue to divert water, it has become necessary to move the <br />point of diversion farther and farther upstream. In the spring when flows in the <br />river are high, water can be diverted with little difficulty, but as the season <br />progresses and flows diminish, diversion of the required flows becomes <br />increasingly difficult. Modification of the river channel and bed is frequently <br />required. Berms and dikes, constructed to maintain diversion capabilities, are <br />routinely washed away by higher flows. <br /> <br />A second problem arises from the minimal slope in the inlet canal to the forebay. <br />One of the results of this flat channel is the slow movement of water. and the <br />resulting growth of moss and algae. The SWCD expends a considerable effort <br />each summer in maintaining flows to the pumping plant. It has become <br />increasingly difficult to utilize herbicides to control the growth of moss and algae <br />due to more stringent regulations governing their use and mechanical methods of <br />control have had limited success. <br /> <br />The SWCD spends about $2,500 a year maintaining the diversion and inlet canal. <br />Redesign,of the diversion and inlet canal would avoid problems associated with <br />disturbance to the Colorado River channel and use of herbicides in the inlet <br />channel. <br /> <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.