Laserfiche WebLink
<br />1998 report to the Rio Grande Compact CommlSSlon <br /> <br />Bureau of Reclamation <br /> <br />~'. " <br />.,': <br /> <br />.':,. <br /> <br />The cores will also be tested for concrete strength. After the data is collected, <br />Reclamation will complete a comprehensive assessment of the pier. <br /> <br />:-,'; <br /> <br />"" <br />..... <br /> <br />Erosion holes were noted in September, 1998 upstream of the Caballo Dam spillway, at <br />the top of the-excavation for the intake structure to the river outlet works. It appears that <br />these or similar holes have been there for many years. This situation is not considered <br />to be serious but will be evaluated during the 1999 Comprehensive Facility Review <br />process. <br /> <br />'-:?I <br /> <br />" <br />1.-.1 <br />',;"j <br /> <br />,0.:_., <br /> <br />;::~: <br /> <br />',." <br /> <br />';'" <br /> <br />:~;;~ <br /> <br />\~: <br />:)jl <br /> <br />,".' <br />...0 <br />", <br />:..'l <br /> <br />'1 <br />,.-.,' <br />~;;.~ <br /> <br />"'J <br />,.;.: <br />;~, <br />~~: <br /> <br />)~ <br />';"1 <br />.~ ., <br /> <br />. ~ <br /> <br />,:-,' <br />~fj <br /> <br />, <br />I <br /> <br />-21- <br />