Laserfiche WebLink
<br />~ <br />C\I <br />0") <br /> <br />. <br /> <br />. <br /> <br />,., COST ESTIMATE: PHASE I I DEMONSTRATION PROJECT <br /> <br />('....1 <br /> <br />~_ Thil eltiaate hal been prepared to live a tirlt-cut boundry to <br />the principal costs and ele.ents of the Phale II De.onatration <br />Project at Palisade, Colorado over the 2 yeaar de.onatration <br />period. <br /> <br />COST ELEMENT <br /> <br />COST <br /> <br />Capital Cost <br /> <br />$500.000 <br /> <br />Operatini Cost <br />Truckini <br />OMR <br /> <br />$840.000 <br />$460.000 <br /> <br />Total Project Cost <br /> <br />$1 , 800,000 <br /> <br />Annual Throughput <br /> <br />54 A tt/yr. <br /> <br />Annual Salt Removal <br /> <br />1365 Tons <br /> <br />RESOURCE APPLICATION: PHASE I FEASIBILITY STUDY <br /> <br />As proposed, Phase I resources are to be allocated as follows: <br /> <br />WESTRANS <br /> <br />$75.000 <br /> <br />International Bio-Resources.lnc. <br /> <br />$60.000 <br /> <br />Denver Engineering Co.pany <br /> <br />$40.000 <br /> <br />Bureau of Reclamation <br /> <br />$25,000 <br />$200.000 <br />