My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06167
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06167
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:21:33 PM
Creation date
10/12/2006 1:28:53 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.40
Description
CRSP
Basin
Colorado Mainstem
Date
6/30/1974
Author
USDOI
Title
Eighteenth Annual Report on the Statuts of the Colorado River Storage Project
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CONSTRUCTION <br /> <br />B{? <br />~ <br />~ <br />~ <br /> <br /> <br />4 <br /> <br />The prime contractor for Crystal Dam <br />(Curecanti Unit) made good progress <br />with excavation of the keyway to bed. <br />rock and preparation for placement of <br />concrete in early 1975. An extension <br />of the Curecanti.Crystal 115- kV trans- <br />mission line was completed, and bi. <br />tuminous surfacing was placed on <br />roadways and parking areas at Morrow <br />Point and Blue Mesa Dams. <br /> <br />On the Glen Canyon Unit, exploratory <br />wells to determine the lake Powell bank <br />storage were completed. A contract was <br />awarded in June 1974 to seal coat the <br />streets of Page, Ariz. <br /> <br />Two contracts 10 rehabilitate the canal <br />and laterals of the Hammond Project <br />were awarded. <br /> <br />Exploratory drilling at the proposed <br />Stateline Dam site, Lyman Project, was <br />completed. The drilling was required <br />to determine feasibility of the site as an <br />alternate 10 the China Meadows sIte. <br /> <br />A contract for spillway repair was <br /> <br />awarded during the year on the lemon <br />Dam. Florida Project, and the work was <br />substantially completed by Ihe end of <br />the fiscal year. <br /> <br />Contracts on the Bonneville Unit. Cen. <br />tral Utah Project, thai were completed <br />include an overlook fence at Soldier <br />Creek Dam; Knight Diversion Dam mod. <br />ification; earthlining Channel No.2, <br />Strawberry Aqueduct; and connecting <br />Currant and layout Tunnels with 132. <br />inch.dlameter pipe for the Water Hollow <br />crossing. Clearing of the Strawberry <br />ReserVOir Enlargement was underway. <br /> <br />A contract for the Bostwick Park later. <br />als (Bostwick Park Project, Colorado) <br />was awarded and completed. <br /> <br />On the Na....ajo Indian Irrigation Project <br />work continued on the main canal, on <br />the access road, and on Tunnel NO.4. <br /> <br />Block No. I drains on the Emery County <br />Project were completed and a contract <br />awarded for the Block No.2 drains. <br />
The URL can be used to link to this page
Your browser does not support the video tag.