My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06167
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06167
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:21:33 PM
Creation date
10/12/2006 1:28:53 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.40
Description
CRSP
Basin
Colorado Mainstem
Date
6/30/1974
Author
USDOI
Title
Eighteenth Annual Report on the Statuts of the Colorado River Storage Project
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1974 FISCAL YEAR <br /> <br />HIGHLIGHTS <br /> <br />v...A.A.A.A.A.A <br />\..AAA.A..A.A.A <br />~ <br />On August 2. 1973, the 10th Circuit <br />Court of Appeals ruled that Congress. <br />by specifically denying funds for barrier <br />dams. had effectively negated clauses <br />in Public Law 84-485 that prohibited <br />reservoir water in Rainbow Bridge Na. <br />tional Monument. The plaintiff's petition <br />for Writ of Certiorari to the U.S. Su- <br />preme Court was denied, thus ending <br />the long litigation over Rainbow Bridge. <br /> <br />A lawsuit was filed in January 1974 <br />by the Sierra Club and others, charging <br />noncompliance with the National Envi. <br />ronmental Policy Act on the Bonneville <br />Unit, Central Utah Project. Federal <br />Judge Willis Ritter, Salt Lake City, ruled <br />on May 21,1974. that the plaintiffs had <br />failed to prove their case. On November <br />29, 1974. the 10th Circuit Court of Ap. <br />peals affirmed the lower court ruling. A <br />petItion for rehearing was later denied. <br /> <br />Congressional hearings were held on <br />H.R. 1194 on October 20. 1973. to fa. <br />cilitate incorporation of the city of Page. <br /> <br />2 <br /> <br /> <br />Arizona (Glen Canyon Unit). Hearings <br />were subsequently held in Washington. <br />D.C.. in March and June of 1974 before <br />both House and Senate Committees on <br />bills for the same purpose. <br />Bids for construction of the Currant <br />Creek Dam. Bonneville Unit. Central <br />Utah Project. were opened on June 18. <br />1974, with the apparent low bid being <br />$18,347.191. Contract was awarded <br />July 15, 1974. <br /> <br />Bids were opened late in the year for <br />Hayden Substation, Stage 02. Construc- <br />tion was completed on Midway Station, <br />Stage 02. and essentially completed on <br />Weld Station, Stage 01. <br /> <br />The Gunnison River was diverted <br />through the dIversion tunnel at the <br />Crystal dam site on the Curecanti Unit <br />on November 6, 1973. <br /> <br />Award of contract was made in June <br />1974 to construct Nambe Falls Dam, <br />San Juan.Chama Project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.