My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06167
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06167
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:21:33 PM
Creation date
10/12/2006 1:28:53 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.40
Description
CRSP
Basin
Colorado Mainstem
Date
6/30/1974
Author
USDOI
Title
Eighteenth Annual Report on the Statuts of the Colorado River Storage Project
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />RATE OF REPAYMENT <br /> <br /> <br />~ $.A.A.J <br /> <br />'-^A.A..A.A.A.J <br />'-^-^A.A.A.A..J <br /> <br />Revenue applied on repayment of the <br />Federal Investment totaled $10.4 mil. <br />lIOn In fiscal year 1974. This brought <br />total repayment through fiscal year <br />1974 to $49.5 mIllion whIch IS approxI- <br />mately 7 percent of the completed plant <br />1/1 servIce and 2.5 percent of the $1.9 <br />billion prOjected total reimbursable <br />Federal Investment In the project. In <br />additIOn to the amount applied on reo <br />payment, the prOject earned revenue <br />sufllClenl to pay all operating and In. <br />terest charges. Operating costs of units <br />and participating projects turned over <br />to water conser-lancy districts for op. <br />eratJon were paid by the respective con. <br />servancy distrIcts. About one-third of <br />the prOjected total reimbursable Fed. <br />eral Investment was In service as of the <br />end of the year. <br /> <br />About $9.9 mIllion or 95 percent of the <br />repayment revenues received in fiscal <br />year 1974 came from the sale of power <br />and was applied to repayment of the <br />power investment About 7 percent of <br />the prOjected total power investment <br />has now been repaid. The $9.9 million <br /> <br />26 <br /> <br />IS a 25 percent reduction In net reve. <br />nue from fiscal year 1973. The reductIOn <br />was the result prinCipally of purchasing <br />energy to meet contractual obligations <br />when generation at Glen Canyon was <br />temporarily cut back to comply With <br />the filling wteria In P.l. 90-537. <br /> <br />ApprOJomately $330.000 In repayment <br />revenue came from municipal and in' <br />dustna! water sales In fiscal year 1974. <br />mostly from sales from the Glen Can <br />yon and NavajO Units, but also from <br />tour participating projects. ThiS reve. <br />nue totaled 10 percent above last year. <br />M&I revenue was received from Glen <br />Canyon and two of the participating <br />prOjects for the first time. The $330,. <br />000 was applied to repayment of the <br />municipal and industrial water Invest. <br />ment. <br /> <br />Water users of seven participating proj. <br />ects paid approximately $240,000 for <br />Irrigation water ser..ice during the year. <br />All of thiS revenue was applied to repay. <br />ment on the Investment whIch now to- <br />tals about $185 million, but which is <br />projected to grow to about $1 billion <br />when all authorized participating proj. <br />ects are completed. <br /> <br />In order to prOVide revenues suffiCient <br />to repay the projected reImbursable <br />costs of authonzed storage units and <br />also to provide the needed repayment <br />aSSIstance lor authorized participating <br />projects Within the tIme lImits pre. <br /> <br />SCribed by law. It Will be necessary to <br />make a second Increase In tile CRSP <br />power selling rate. The Increase reo <br />QlJIred Will place the selling rate about <br />8.5 percent above the current rate, <br />whIch became effective Aprrl I, 1974, <br />and about 10.4 percent above the origi. <br />nal rate which was In eflect to April <br />1974. The increase is reflected In Ex. <br />hlblt F. <br /> <br />Reasons for the prolected Increase are <br />the Inflationary rlse In present and pro <br />Jected power-system operating costs, es. <br />timates of higher costs to complf>te con. <br />struction 01 authOrized units and par. <br />tlclpatlng prOject faCIlities, reduction 111 <br />esftmated power revenue Income be- <br />cause of projected acceleration of water <br />depletions. and the inclUSIon 01 future <br />payment from power revenue of a por- <br />!lon of the estimated construction and <br />operatmg costs of speCIfied units of the <br />Colorado Rivet Sallntty Control Progrilm <br />iP,L, 93 320-88 SIal, 266), <br /> <br />ProJectrons usmg current estimates of <br />CRSP costs, construction schedules <br />and Increased net Income from power <br />and water sales. ad valorem takes and <br />miscellaneous revenue, show that pay <br />out of the reimbursable costs olthe au <br />thomed Colorado RIver Storage Prol <br />ect and Parllclpatmg Projects can be <br />accomplished within authOrized repay <br />ment periods (Exhibit F). <br />
The URL can be used to link to this page
Your browser does not support the video tag.