My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06160
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06160
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:21:31 PM
Creation date
10/12/2006 1:28:47 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8273.600.20
Description
Colorado River Basin Salinity Control - Federal Agencies - USDA
Basin
Colorado Mainstem
Water Division
5
Date
1/1/1983
Author
USDA
Title
1982 Annual Report - Colorado River Basin Salinity Control Program
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />?tm~) <br /> <br />f\) <br />w <br />W <br />1-'. <br /> <br />.:.", <br />,::t~~:~~.-i <br />~:.;"'<:/..! <br /> <br />,.' <br /> <br />VI. FUNDING AND BUDGETING <br /> <br />For FY-83, USDA has continued to use multiple agency funding procedures. <br />Various agency budgets for FY-83 were formulated independently and submitted <br />through the normal budgeting proce,ss with no real effort to correlate or <br />consolidate the CRBSCP funding levels. The, general breakdown on,agency <br />funding levels for 1983 are as follows: <br /> <br />FY.,.83 <br /> <br />Change Over <br />FY-82 <br /> <br />SCS - Technical Assistance <br />Salinity Units Studies <br />ASCS - Cost Shares (ACP) <br />ARS - Research & Demonstration <br />CSRS - Research Support <br />ES - Extension Education <br /> <br />$ 500,000 <br />o <br />3,700,000 <br />1,000,000 <br />o <br />o <br /> <br />$ same <br />-200,000 <br />same <br />+600,000 <br />-161,000 <br />-250,000 <br /> <br />TOTAL <br /> <br />5,200,000 <br /> <br />-11,000, <br /> <br />These funding levels essentially allow USDA to continue with the two <br />implementation projects and to expand ARS research efforts. CSRS and ES <br />activities are not fund€d for FY-83. There are no funds provided for SCS <br />salinity control unit studies in FY-83. <br /> <br />ARS reports the $600,000 increased funding will be used to expand research on <br />salinity control in the Colorado River Basin. A coordinated research approach <br />and implementation plan involving several ARS locations is currently being <br />developed. <br /> <br />During the past year, USDA did develop a proposal for a consolidated account <br />to cover the USDA CRBSCP in FY-84. With the support and concurrence of the <br />Under Secretary for International Affairs and Commodity Programs ,and the <br />Assistant Secretary for Natural Resources and Environment, ASCS and SCS took <br />the leadership to develop a fully coordinated budget package. Included within <br />the consolidated account are funds for ASCS, SCS, and ES. ,The funds will, <br />provide for cost-sharing, technical assistance, salinity stuuies"monitoring, <br />and extension education support. Research funding for ARS and CSRS were not <br />included in the consolidated account at this time. <br /> <br />A component of the FY-84 consolidated budget proposal was a "modified" USDA <br />CRBSCP implementation schedule. Previous implementation schedules showed <br />rapid increases in funding levels from $5.0 million per year to in excess of <br />$50.0 million per year in less than four years. Table VI-l presents the <br />"modified" USDA implementation costs and distribution which shows gradual <br />funding increases with a peak ceiling of approximately $25.0 million per year <br />in FY-88 through FY-93. The implementation time frame was extended by six <br />years to be completed by the year 2000. <br /> <br />This modified implementation schedule presents a more gradual and realistic <br />transition into full scale implementation of the various USDA onfarm salinity <br />control projects. Figure VI-l identifies the proposed projects and present <br />implementation schedule for onfarm salinity controls. While'this schedule may <br />be changed, and is, of course, subject to Congressional funding, USDA feels <br />that through this schedule the Colorado River salinity control objectives and <br />water quality standards can still be achieved while States continue to more <br />fully develop their compact-apportioned water supplies. <br /> <br />23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.