Laserfiche WebLink
<br />'~!i.~~~:} <br /> <br />Table III-I <br /> <br />Practices Installed <br />SCS Onfarm Improvement Program <br />Well ton-Mohawk Irrigation and Drainage District <br /> <br />, . <br /> <br />.~ ~ <br /> <br />N PRACTICES 1982 CUHULATIVE <br />W 1. Ditch Lining (FT) , 128,571 961,656 <br />--1 <br />CO 2. Land Leveling (AC) 4,902 30,950 <br /> 3. Structures for Water Control and <br /> Measurement (NO) 1,012 7,136 <br /> 4. Soil Improvement (AC) 214 1,870 <br /> 5. Pumping Plants (NO) 0 10 <br /> 6. Drip, Bubbler Irrigation Systems (NO) 1 10 <br /> 7. Vertical Underground Barriers (FT) 7,877 14,505 <br /> Federal Cost $ $ 2,117,401 $ 11,540,746 <br /> Nonfederal Landowner Cost $ 705,800 3,846,915 <br /> Total Cost y $ 2,823,201 $ 15,387,661 <br /> <br />': -'- <br />~~?/>~i <br /> <br />" <br />..-..... . <br />" <br /> <br />1/ <br /> <br />Excludes 1982 SCS technical assistance costs of $370,970 and total SCS <br />technical assistance to date of $2.395,273. <br /> <br />Figure III.3 <br /> <br />2QQQl39 <br /> <br />WELLTON-MOHAWK 1975-1982 <br />DRAINAGE RE'ruRN FLOW (ACRE FEET) <br />ACTUAL AND PROJECTED FLOWS <br />. ' <br />..............- <br />~ <br />ArnJAL ~-------./ <br />FLOW <br /> <br /> \7SAGa <br />P <br />R <br />C <br />,J <br />E I !ia\lml <br />C <br />T <br />E <br />D <br /> 12 <br /> <br /> <br />,PROJECTED <br />1 FLOW <br />"- <br />, <br /> <br />" <br />, <br />, <br /> <br />1974 INITIAL GOAL <br /> <br />136,000 AC. FT.~ <br /> <br />" <br /> <br />REVISED 1979 GOAL <br /> <br />108,000 AC. FT. J <br /> <br />"- <br />'. <br />, <br />, <br />',.... <br />, <br />, . <br /> <br />\~ <br />7& <br /> <br />"""'1'1........1...."...1.........1.........................'..,1'........1...'.....1........., <br /> <br />8S <br /> <br />86 <br /> <br />83 <br /> <br />84 <br /> <br />7. <br /> <br />7Q <br /> <br />8Q 8\ <br />YEAR <br /> <br />82 <br /> <br />76 <br /> <br />77 <br /> <br />11 <br />