My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06119
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06119
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:21:21 PM
Creation date
10/12/2006 1:26:38 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8277.100
Description
Salinity Projects Not Located in Colorado - Colorado River Salinity Control Forum
Basin
Colorado Mainstem
Date
9/6/1996
Title
Basinwide Salinity Control Program Proposals - Ranking
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />SEP-12-96 THU 02:34 PM BUREAU OF RECLAMATION <br /> <br />FAX NO, 801 524 3336 <br /> <br />. <br /> <br />p, 05 <br /> <br />Jbmmond Proposal- This proposal is based on Reclamation's report titled, San Juan River <br />Unit-Hammond Project Portion, Final Planning ReportlEnvironmental AssessmentlFinding of <br />No Significant Impact, dated December 1994. This proposal includes off-farm improvements <br />(canal and lateral lining) evaluated in Reclamation's report. The proposal would implement the <br />plan included in Reclamation's report through a construction cooperative agreement. The <br />effectiveness of this project was estimated at 27,700 tons per year, but may be as high as 68.560 <br />tons. To be consistent with other projects, the averaie of the two estimates (48,1 ~O tons per <br />year) was used. The perfonnance risk of this proposal is comparable to other irrigation <br />improvement projects and deemed acceptable. The rankinl! committee recommends that <br />Reclamation oroceed with ner:otiations for the imDlementation of this DtoOOsaI. <br /> <br />Uncompahgre Valley Proposal- This proposal is based on Reclamation's report titled, Lower <br />Gunnison Basin Unit, East Side Laterals, Supplemem to the Feasibility Report, dated September <br />1994. This proposal includes off-farm improvements evaluated in Reclamation's report (canal <br />and lateral lining). The proposal would implement the plan included in Reclamation's report <br />through a constrUCtion cooperative agreement The costs included in the report assume about a <br />40 percent savings due to construction by the district. The performance risk of this proposal is <br />comparable or better than other irrigation improvement projects due to past work done by the <br />district on other salinity control improvements. However, at this time, the cost of the proposal is <br />significantly higher than the other proposals. The rankin~ committee doe.~ not recommend <br />imolementation of this orooosal at this time. <br /> <br />OOCL20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.