Laserfiche WebLink
<br /> <br />107:1 <br /> <br />. <br /> <br /> <br /> <br />PUEBLO DAM - The downstream face of Pueblo Dam showing <br />the concrete portion with the spillway section. The <br />left abutment is finished to grade and the right abut- <br />ment still has about 35 feet remaining to be placed. <br />(P-382-706-l5l7l) <br /> <br />. <br /> <br />8 <br /> <br />. <br /> <br />