My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06055
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06055
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:21:03 PM
Creation date
10/12/2006 1:24:57 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8583
Description
Rio Grande Decision Support System
State
CO
Basin
Rio Grande
Water Division
3
Date
6/1/1999
Title
Various Rio Grande reports
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />00 19~.r:) <br /> <br /> <br />RIO GRANDE COMPACT <br />June ii, 1999 Analysis <br />Closed Basin Project Split: 60/40 <br /> <br />RIO GRANDE BASIN <br /> <br />NRCS 5-6.99 Forecast of <br />April. September Index <br />Flows = 568,000 <br /> <br />Index Supply <br /> <br />January. February <br />March <br />April <br />May <br />June1.10 <br />June 11 . September <br />October' <br />November. December <br /> <br />24,600 . <br />22,500 . <br />41,900 . <br />170,000 . <br />83,500 . <br />272,600 forecast <br />30,000 estimate <br />30,000 estimate <br /> <br />Total <br /> <br />675,100 <br /> <br />ObligatIon = 193,000 <br /> <br /> Deliveries <br /> January. February . 34,800 . <br />Curtailment March native 12,900 . <br /> April 4,500 . <br /> .:rvK.e11 May 26,700 . <br /> June 1 -10 16,400 . <br />Req Dellv 54,200 17.9% June 11 . Oct native 54,200 lneeded <br />Native Index 302,600 Nov - Dec native 34,000 estimate <br /> Total 183,500 <br />T O.\.JL '2. .I~, "L"I., <br /> Paper Credit 5,000 <br />Mv-r '2..'-1 /7. '3"'/.. SC Norton Drain Flow -4,000 estImate <br /> Remaining CBP Share 8,500 estimate <br />M..M{ 7 lb. r; '/~ <br /> Total Required Delivery 193,000 <br /> Expected Overdelivery 0 <br /> <br />. = Actual measured flows (Deliveries Include Closed Basin Project share) <br />All values In acre-feet <br />. Assumes 60% of the Closed Basin Project flows are creditable to the Rio Grande <br />(Projected delivery of creditable CBP production to the RID Grande Is 25,000 acre-feet) <br />- Asssumes no recharge diversions after November 1, 1999 <br />Trlnchera Creek flow to the Rio Grande wllllncrease delivery <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.