My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06055
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06055
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:21:03 PM
Creation date
10/12/2006 1:24:57 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8583
Description
Rio Grande Decision Support System
State
CO
Basin
Rio Grande
Water Division
3
Date
6/1/1999
Title
Various Rio Grande reports
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />001914 <br />RECEIVED <br />"-"'.. <br />,~- <br />MAY 1 72001 <br /> <br />RIO GRANDE COMPACT <br />April 4, 2001 Analysis <br />Closed Basin Project Split: 60/40 <br /> <br />Colorado Wata, Conservation Board <br /> <br />CONEJOS RIVER BASIN <br /> <br />NRCS ~-4.01 Forecast of <br />April. September Index <br />Flows = 262,300 <br /> <br />Index Supplv <br /> <br />Conejos = <br />Los Pinos = <br />San Ant. = <br /> <br />January - February <br />March <br />April - September <br />October <br />November - December <br /> <br />186,000 <br />65,000 <br />11,300 <br /> <br />Total <br /> <br />Obligation = 102,200 <br /> <br />Deliveries <br /> <br />Curtailment <br /> <br />January - February <br />March <br />April. October <br />Nov. Dec native <br /> <br />Rea Deliver 46,900 17.3% <br />Native Index 271,100 <br /> <br />Total <br /> <br />Carryover Credit in E.B. <br />Paper Credit <br />SC Norton Drain Flow <br />Remaining CBP Share <br /> <br />Total Expected Delivery <br /> <br />Expected Overdelivery <br /> <br /> <br />5,100 * <br />4,500 * <br />262,300 forecast <br />8,800 estimate <br />9,300 estimate <br /> <br />290,000 <br /> <br />6,700 * <br />7,300 * <br />46,900 needed <br />6,000 estimate <br /> <br />66,900 <br /> <br />22,500 <br />5,000 <br />4,000 estimate <br />3,800 estimate <br /> <br />102,200 <br /> <br />* = Actual measured flows (Deliveries include Closed Basin Project share) <br />- All values in acre-feet <br />- Assumes 4Cl% of the Closed Basin Project flows are creditable to the Conejos <br />(Projected delivery of creditable CBP production to the Rio Grande is 14,000 acre-feet) <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.