Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />e <br /> <br />001523 <br /> <br />Aspinall- ? <br />Dallas Creek-17,000 AF; <br />Dolores-either 131,000 AF or 81,000 AF; <br />300 cfs bypass (protected by TNC donation); <br />300,000 AF for development in Colorado (see Curecanti Economic Justification <br />Report); <br />Uncompahgre Valley Water Users Association from credits in Blue Mesa; <br />Project 7 exchange account with Ridgway; <br />Downstream seniors; <br />NPS contract; <br />Reservoir evaporation and other water right administration releases; <br />Administration of the 60,000 AF subordination if required <br />(Selective call issues iflimited to west slope, value of Aspinall rights if <br />administered as most junior to avoid selective call issues); <br />Non-storable inflows (Releases from Taylor Park directly to Gunnison <br />Tunnel); <br />Strictly for Power generation; <br />A storage target and which mayor may not generate power; <br />No specific purpose (are not or can not be directly tied to any specific purpose) <br />(unallocated). <br /> <br />The major question with the releases identified above is whether or not to keep tract of <br />them separately. Ifnot, which account should they be charged against? <br /> <br />4. <br /> <br />Operational Considerations and Coordination Needs <br />How do we deal with constraints imposed by the following: <br />potential out-of-priority storage to accommodate CDOW trout studies; <br />potential out-of-priority storage for flood control, and other emergencies; <br />the 1975 exchange agreement (size ofUVWUA pool in Blue Mesa, maximum <br />rate of transfer of 1st fill water into Blue Mesa, timing of transfers); <br />Ideal flows for rafting in the Black Canyon; <br />Ramping rates and the potential to forgo storage or store out-of-priority; <br />Contract releases and the potential to forgo storage or store out-of-priority; <br />Western Area Power Administration operations; <br />Changing inflow forecasts; <br />CRSP requires all releases to be made through the power plants if possible. <br />The operations matrix developed should be consulted for the specific range of values <br />which different agencies have indicated as preferred. <br />