Laserfiche WebLink
<br />. :~... <br /> <br />, <br /> <br />SUHNARY SHEETS (Continued) <br /> <br />Co.ST ALLaCATIaNS <br /> <br />Construction <br />costs <br /> <br />Reimbursable costs <br />Muni~ipal and industrial water <br />Irrigation <br />Recreation <br />Subtotal <br />Nonreimbursable costs <br />Fish and wildlife <br />Recreation <br />Flood control <br />'Highway improvement <br />,Subtotal <br />Total <br /> <br />$24,612,0.0.0. <br />15,279,000 <br /> <br />39,891,0.0.0. <br /> <br />1,773,0.0.0. <br />10,10.0.,00.0. <br />1,20.6,0.0.0 <br />1,430,0.0.0. <br />14,509,0.0.0 <br />54,400.,0.00. <br /> <br />Annual <br />operation, <br />maintena:nce, <br />and replace- <br />ment costs. <br /> <br />$26,0.0.0 <br />7,00.0 <br />30.0.,00.0. <br />333,00.0 <br /> <br />2,000. <br /> <br />2,000 <br />335,0.0.0 <br /> <br />REPAYNENT aF REINBURSABLE PROJECT COSTS (50-year repayment period) <br /> <br />Nunicip"l and industrial waterll <br />Credits from Colorado River <br />Development FuneIlI <br />Tri-County Water Conservancy District <br />Su btotal <br />Irrigation <br />Credits from Colorado River <br />Development FundY <br />Tri-County Hater .CVl.lsl<rvan.a,vy,Oistrict <br />"e ...'t<J ~u_ "'l/<"~" f'~ <br />~ 1P Irrigators: . v <br />I~ Account charges 110 p<uM"lflJ<'f"~- <br />Ad valorem tax <br />Apportioned revenues from Colorado <br />River Storage Project <br />Subtotal <br /> <br />$20.5_.-000. <br />24,lLQl~~' <br />24,612,0.00. <br /> <br />127,000 <br /> <br />2,025,000 <br />1,175,000 <br />3,066,000 <br /> <br />8,886,000 <br />15,279,000. <br /> <br />$26,0.00. <br />26,00.0 <br /> <br />7,0.00 <br /> <br />~aao <br /> <br />Recreation <br />State of Colorado lQ~LQgQ <br />Total 39,891,0.00 333,000 <br />II Construction costs alloc~ted to munlcipal Bnd industrial use <br />would be repaid with interest at r"te applicable at time of construc- <br />tion, assumed at 5.116 percent annually. At the assumed rate p3yrnents <br />would also iuclude $3,559,000 in interest during construction. <br />J! Credits tow3rds costs of investigation. <br /> <br />3 <br />