My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05984
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05984
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:20:45 PM
Creation date
10/12/2006 1:23:49 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8149.911
Description
Miscellaneous Small Projects and Project Studies - SE Needs Assessment and PSOP
State
CO
Basin
Arkansas
Water Division
2
Date
4/19/2001
Author
PSOP Implementation
Title
Final PSOP Implementation Committee Report Addendum to Preferred Storage Options Plans Report
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />II <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />10'" " <br />t t' <br /> <br />DRAFT <br /> <br />remaining term of Contract No. 5-07-70-W0086, as amended, between the Southeastern <br /> <br />Colorado Water Conservancy District and the United States. The Secretary shall renew any <br /> <br />contract executed pursuant to this section at the end of the contract term on such conditions as he <br /> <br />finds to be just and equitable. The term of such contract renewal shall be for a duration no less <br /> <br />than the term granted the Southeastern Colorado Water Conservancy District under the <br /> <br />contractual arrangement negotiated upon the expiration of Contract No. 5-07-70- W0086, <br /> <br />U(c) To the extent water stored under the Project's Winter Water Storage Program spills <br /> <br />from Pueblo Reservoir due to execution of a contract executed pursuant to this section, it will not <br /> <br />be considered impairment or interference under subsection (a)(5) of this section if the holders of <br /> <br />such stored water are compensated by a credit for purchase of project water to replace such <br /> <br />spilled water, such credit to be financed by a surcharge as described in subsection (d)(4) imposed <br /> <br />on contracts executed pursuant to this section, <br /> <br />"(d) The Secretary shall not execute a contract pursuant to this section with any entity that <br /> <br />has not signed an agreement with the Southeastern Colorado Water Activity Enterprise: <br /> <br />(I) Agreeing to reimburse an appropriate amount of the Southeastern Colorado Water <br /> <br />Activity Enterprise's implementation and development costs, including such costs reimbursed to <br /> <br />the United States, incurred in determining and making excess storage or conveyance capacity <br /> <br />available for such storage of non-project water by municipal water providers within the project <br /> <br />boundaries; <br /> <br />(2) Agreeing to cooperate in a flow management program designed to maintain target <br /> <br />minimum flows of 100 c.f.s. on the Arkansas River just below Pueblo Dam, as provided in the <br /> <br />BURECOPI <br />
The URL can be used to link to this page
Your browser does not support the video tag.