<br />1102 G <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Final PSOP Implementation Committee Report <br />Southeastern Colorado Water Activity Enterprise <br />April 19, 2001 <br /> <br />Section 3 - Enlargement of Fry-Ark <br />Facilities <br /> <br />3.1 Enlargement Details <br /> <br />Phase II of the Preferred Storage Options Plan calls for the enlargement of existing Fry-Ark <br />Project reservoirs in order to meet the full demand for storage. The PSOP first proposes the <br />enlargement of Pueblo Reservoir by 54,000 acre-feet to meet demands in 2013. Next, the <br />PSOP calls for the enlargement of Turquoise Reservoir by 19,000 acre-feet; this additional <br />storage space is needed to meet the year 2025 demand. All water-user entities within the <br />boundaries of the Southeastern Colorado Water Conservancy District will be eligible to <br />participate in these enlargement projects under the terms described below. <br /> <br />The exact amount of additional storage available for participants in the enlargement project <br />will be determined by a combination of the federal,level feasibility study(s), congressional <br />authorization, negotiations with the Bureau of Reclamation, and the final EIS for the <br />enlargement project. The enlargement projects will be implemented in such a way so as to <br />maximize the development of additional storage. It may be more cost effective to pursue a <br />60,000 acre-foot enlargement of Pueblo Reservoir, depending upon the outcome of the <br />federal studies and the exact level of participation by water users. <br /> <br />3.2 Funding the Enlargement Projects <br /> <br />Individual participants (allotment contractors) will be responsible to fund the engineering, <br />final design, and construction of their portion of the enlargement project. Allotment <br />contractors will also be responsible for the costs of developing the Enterprise Water <br />Management Storage as described in the Limitations and Obligations portion of this section <br />of the Implemenfation Committee Report (pages II and 12). <br /> <br />It is important that the Enterprise develop the maximum amount of additional storage <br />necessary to meet future, District-wide needs. Toward that end, the Enterprise will pursue <br />opportunities to fund additional Enterprise Water Management Storage beyond that provided <br />by the allotment contractors' 15 percent mitigation targeting a total of 10,000 to 20,000 acre- <br />feel. Funding options may include a rate-based structure and/or the use of the District's <br />existing mill levy. A mill-levy funding approach would of course require a District-wide <br />vote, and would need the support of all water-user entities in the District. Enterprise staff will <br />work with the Enterprise Board over the next two years to devise an appropriate funding <br />plan. The funding plan will be in place before the Enterprise seeks final congressional <br />authority for construction of the enlargement projects. <br /> <br />8 <br /> <br />9'lO61 FnulPSOPRepon <br />