<br /> <br />.' <br /> <br />000712 <br /> <br />. <br /> <br />. <br /> <br />August 27, 1968 <br /> <br />REPORT OF BUREAU OF RECLAMATION, REGION 4 <br />TO COLORADO WATER CONSERVATION BOARD <br /> <br />CONSTRUCTION <br /> <br />Curecanti Unit <br /> <br />Blue Mesa Dam, powerplant, and switchyard were transferred to operation and main- <br />tenance on April 1, J968. The Blue Mesa powerplant is now being remotely operated and <br />controlled from the Power Operations Center at Montrose, Colorado. <br /> <br />Work has been substantially completed under the prime contract for Morrow Point Dam <br />and powerhouse. The prime contractor completed removal of his construction equipment <br />from the area during June, and painting, electrical, and metal workers are presently en- <br />gaged in completing the few cleanup chores that remain. Specifications will be issued this <br />fall for completion of Morrow Point powerplant and switchyard facilities. Much of the <br />electrical equipment has been manufactured for the powerplant. Many of the smaller elec- <br />trical items are already in storage on the project; however, turbines, generators, and other <br />large items of equipment will be shipped from the manufacturers' plants as needed by the <br />completion contractor. <br /> <br />Transmission Division <br /> <br />Rifle Substation was accepted as substantially complete July 20, 1968, and the <br />Hayden-Curecanti 230-kv transmission line was connected through the substation transfer <br />bus on July 3J. Work was resumed in the Grand Mesa area late in May on access roads <br />needed for maintaining the Curecanti -Rifle segment of the Curecanti -Hayden 230-kv trans- <br />mission line. The contractor has accomplished nearly 90 percent of his work. We have been <br />very pleased with the progress made at the Midway Substation. The contractor there is <br />expected to complete his work well in advonce of the November completion date. <br /> <br />Bostwi ck Park <br /> <br /> <br />The contractor for Silver Jack Dam is concentrating his efforts on concrete work this <br />year. The outlet works intake structure, conduit, stilling basin, and outlet channel have <br />been completed, and construction work is now centered on the spillway structure. It has <br />been necessary to modify,our original spillway design due to foundation conditions. The <br />extremely rainy weather of the past month has handicapped all phases of the contractor's <br />work. He plans to place only about 300,000 cubic yards of earth and rock fill for the dam <br />embankment this year, then to mobilize next year to complete all embankment operations <br />for the dam before the 1969 winter shutdown. <br /> <br />