My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05980
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:20:44 PM
Creation date
10/12/2006 1:23:47 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.114.J
Description
Dolores Participating Project
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
3/15/1999
Author
USDOI - Water and Po
Title
CRSP Power Peaking Capacity - Dunham Point Unit - Colorado - Plan of Study
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />,. <br /> <br />34b~ <br />, than ~,710 acre-feet annually or less than one-third of the total available was a~ <br />diverted. <br />-- <br /> <br />2, <br /> <br />The full utilization of the Big Thompson River source water would have reduced the <br />Adams Tunnel diversions that were necessary to supply the historical project demands, <br />Our analysis indicated that the Adams Tunnel diversions could have been reduced by an <br />,..- <br />average of approximately 15,200 acre:feet annually, Reduced Adams Tunnel diversions <br />would have increased the spills from Granby Reservoir by an average of approximately <br />13,000 acre-feet annually and would have reduced target flow "'hortages in the 15-Mile <br />l3each by an average of more than approximately 3,600 acre-feet annually, <br /> <br />3, <br /> <br />Our analysis showed that Carter Lake and Horsetooth Reservoir can be operated so that <br />all or nearly all of the in-priority Big Thompson River water can be diverted and made <br />J:lart of the project water supply Without reducing the historical vield to the C-Br unit <br />owners, <br />- <br /> <br />4, <br /> <br />The C-BT Project delivered an annual average 37,800 acre-feet of non-charge water <br />during 1983-98. These non-charge deliveries occurred in 1983-87 and 1995-98 (9 of the <br />16 years in the study period) and amounted to about 18 percent of the total deliveries, <br />The non-charge deliveries exceeded 100,000 acre-feet in 1986 and 1987 and <br />approached 100,000 acre-feet in 1997, Prior to 1983, non-charge deliveries occurred in <br />- -- <br />.~Iy 1962 and 197L <br /> <br />5, <br /> <br />The deliveries of non-charge water to the Big Thompson River, averaging 8,730 acre- <br />feet annually during 1983-98, were not fully diverted by the water users on the Big <br />Thompson River. Our flow calculations and comparisons indicated that an average of <br />3,423 acre-feet of this water was not diverted by Big Thompson River water users, Thus, <br />an average of 39,3 percent of the total went undiverted on the Bia Thompson Rive.!', <br />While this analysis considered only water uses on the Big Thompson River, the fact that <br />calls were not occurring on the South Platte River on the days when this undiverted non- <br />charge water was being delivered would indicate that it was not being diverteCl or used \ <br />"- <br />on the South Platte River either, Our inspection of the records for tne flow in the South <br />'- <br />Platte I{lver Clownstream from the mouth of the Big Thompson River tends to confirm <br />this, Also, our inspection of the flow records for the Cache La Poudre for the times when <br />the non-charge deliveries were being made indicated that similar conclusions can be <br />made with respect to the non-charge deliveries to the Cache La Poudre, <br /> <br />6. <br /> <br />Reductions in the non-charge deliveries during 1983-98 obviously would have reduced <br />the Adams Tunnel diversions and the target flow shortages in the 15-Mile Reach, Our <br />~ ~ <br />anaTysis indicated that the elimination of the non-charge deliveries would have reduced <br />the target flow shortages by an average of approximately 13,300 acre-feet annually <br />when combined with increased utilization of the C-BT Project's Big Thompson River <br />water supply, <br /> <br />2 <br /> <br />\ ~ <br />Ii' lOt' f <br />(\c- (S ~ <br />~~Q) '0 <br />V' 1\ <br />!p\ <br /> <br />v~ <br />~~p) <br />l~ <br /> <br />w~~ <br /> <br />l'D(\/. : <br />if <br />V <br />~ " <br />t- t. I, <br />Dr (' t, <br />(' \\\9 i 0 i <br />q %01 ~ <br />71\ I <br />.J~ ; <br />.. 'J I <br />l: <br />J \' <br />/\'!! ./If <br />1,) ,,-j.,l"\ <br />0~'<i <br />o '1 ~ <br />'1>' <br /> <br />" <br />! <br /> <br />I <br />" <br />II <br />I <br /> <br />,i <br />" <br />II <br />I <br />., <br /> <br />}~ <br />s I' ,\ <br />"O~ ~ ~ " <br />~I rf. "\' <br />~'1 l <br />*V\ <br />
The URL can be used to link to this page
Your browser does not support the video tag.