My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05971
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05971
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:20:42 PM
Creation date
10/12/2006 1:23:41 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8210.140.20
Description
Colorado River Basin Organizations and Entities - Colorado River Basin States Forum - California
State
CA
Basin
Western Slope
Date
1/1/1978
Author
Myron B Holburt
Title
Appendix to Annual Report of the Colorado River Board of California for the Calendar Year 1977
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />- ~"'\" r' r-'" <br />11 U ,) <br /> <br />TABLES <br /> <br />1. <br /> <br />Measured Flow in Colorado River and Tributaries <br />for \'Tater Year 1976-77 . . . . . . . . <br /> <br />2. <br /> <br />Capacity, Active Storage, and Storage <br />Major Colorado River Basin Reservoirs <br />Hater Year 1976-77 . . . . . . <br /> <br />. . . <br /> <br />Change of <br />During <br /> <br />3. <br /> <br />Diversions Less Measured Returns for Major Water <br />Users, Lower Colorado River, 1973 to 1977. . <br /> <br />4. <br /> <br />Deliveries to Mexico, Colorado River System, <br />1962 through 1977. . . . . . . . . <br /> <br />. <br /> <br />5. <br /> <br />Summary of Operations Below Parker Darn for <br />Calendar Year 1977 . . . . . . . <br /> <br />. <br /> <br />. <br /> <br />6. <br /> <br />Major Colorado River Basin Power Plants, Operating <br />Characteristics, and Reservoir Levels, Water Year <br /> <br />1976-77 . . . . . . . . . . . . . . <br /> <br />7. <br /> <br />Releases from Hoover Darn and Energy Delivered <br />to Hoover Power Allottees, 1962-63 to 1976-77 <br /> <br />Monthly Firm Energy Deficiency at Hoover Power <br />Plant Caused by Filling of CRSP Reservoirs for <br />1976-77 Operating Year and Water Year . . . <br /> <br />8. <br /> <br />9. <br /> <br />Operating of Minute No. 218, rUnute No. 241, and <br />Minute No.2/.,.2 (1965 to 1977). . . . . . <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />~ <br /> <br />. <br /> <br />2 <br /> <br />. <br /> <br />. <br /> <br />3 <br /> <br />. <br /> <br />. <br /> <br />4 <br /> <br />. <br /> <br />. <br /> <br />5 <br /> <br />. <br /> <br />. <br /> <br />3 <br /> <br />. <br /> <br />. <br /> <br />9 <br /> <br />. <br /> <br />. <br /> <br />10 <br /> <br />. <br /> <br />. <br /> <br />11 <br /> <br />. <br /> <br />. <br /> <br />.13 & 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.