Laserfiche WebLink
<br />POTENTIAL FOR ONFARM IRRIGATION IMPROVEMENTS TO REDUCE SALINITY <br />LOWER GUNNISON SALINITY CONTROL STUDY, COLORADO <br /> <br />TABLE OF CONTENTS <br /> <br />Item <br /> <br />Page <br /> <br />I. Summary <br />Recommendations for Implementation <br /> <br />1 <br />5 <br /> <br />II. Introduction <br />Authority for Investigation <br />Purpose and Objectives <br />Scope of Study <br />Study Coordination <br />Irrigation Management Scheduling <br />Description of Plan Formulation <br />Levels of System Improvements <br />Levels of Improvement <br />Economic Analysis <br />Onfarm Benefits <br />Downstream Benefits <br />Other Benefits <br />Principles and Standards <br /> <br />6 <br />6 <br />6 <br />7 <br />8 <br />8 <br />9 <br />12 <br />12 <br />14 <br />14 <br />14 <br />15 <br />15 <br /> <br />III. Setting <br />Location <br />Physiography and Geology <br />History and Archaeology <br />Climate <br />Water Supply <br />Land Resources <br />Wildlife Resources <br />Social and Economic Characteristics <br />Present Land and Water Uses <br /> <br />16 <br />16 <br />16 <br />17 <br />17 <br />19 <br />19 <br />19 <br />22 <br />24 <br /> <br />IV. Problems and Needs <br />His torical <br />Salinity Problems in the Lower Gunnison Unit <br />Salt Loading <br />Erosion and Sediment <br />Water Supply Management <br />Water Budget Analysis <br /> <br />27 <br />27 <br />28 <br />31 <br />31 <br />31 <br />31 <br /> <br />V. Plan Formulation and the Alternative Plans 35 <br />Off-farm Lateral Improvements 38 <br />Plan Formulation 39 <br />Plan One -.Continuation of Ongoing Programs 40 <br />Plan Two - Improved Irrigation Water Management - 43 <br />Minimum Level - 55,900 acres <br />Plan Three - Onfarm Ditch Lining - Minimum Level - 35,800 acres 46 <br />Plan Four - Irrigation Water Management and Onfarm Ditch 48 <br />Lining - Minimum Level - 43,800 acres <br />Plan Five - Irrigation Water Management and Onfarm Ditch 50 <br />Lining - Maximum Level - 41,400 acres () 0 C 8 ~ ~ <br />