My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05904
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05904
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:20:25 PM
Creation date
10/12/2006 1:21:15 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8111.600
Description
ARCA Annual Reports
Basin
Arkansas
Date
6/1/1985
Author
ARCA
Title
Thirty-Sixth Annual Report Arkansas River Compact Administration for the Year 1984
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br /> <br />6. Facts about the John Martin Project: <br />The John Martin Reservoir Project was built by the Corps of <br />Engineers, United States Army. The project was authorized by Congress <br />in the Flood Control Act of June 22, 1936, when tbe federal responsibility <br />for nood control throughout the country was assigned to the Corps of <br />Engineers. It is located on the Arkansas River, 58 miles upstream from <br />the Colorado-Kansas stateline and 18 miles upstream from the city of <br />Lamar, Colorado. Construction ol the proiect began in the fall of 1939, but <br />work was suspended by World War II [rom the spring of 1943 to the spring <br />of 1946. The project was completed in October 1948 at a cost of about $15 <br />million. The War Department Civil Appropriation Act of June 24, 1940, <br />changed the name of the project from Caddoa Reservoir Project to John <br />Martin Reservoir Project, in honor of the late Congressman John A. <br />Martin of Colorado. It is operated by the United States Army Engineer <br />District. Albuquerque, New Mexico. Mr. Russell Smith has been the <br />resident superintendent of the project since October, 1976. <br />The John Martin Reservoir Project is part of the comprehensive plan <br />for the control of floods and the development of the water resources of the <br />entire Arkansas River basin. The reservoir provides 270.375 acre-feet of <br />storage capacity for flood control. It protects the fertile Arkansas Hiver <br />Valley below the dam. H provides 350.951 acre.feet of storage space for <br />conservation and recreation. John Martin Reservoir supplies water to the <br />irrigated lands below the dam as far as Garden City, Kansas. The top of <br />the conservation pool is 3,851 feet abo....e mean sea level, which provides <br />350,951 acre-feet of storage for irrigation. The release of stored flood <br />waters in excess of the conservation and recreation pools and above <br />elevation 3.851 feet is planned so that, when combined with flows <br />originating downstream from the dam, the capacity of the channel will <br />not be exceeded. Upon request of the Arkansas River Compact <br />Administration, irrigation water for downstream water users is released <br />through the outlet works in the base of the dam. Downstream flood <br />damages prevented by John Martin dam already exceed the cost of the <br />project. Benefits have already passed the $92 million mark. <br />Recreation and favorable fish and wildlife habitats are derived from <br />this project. With reservoir lands open to all, there are many attractive <br />public use areas for outdoor recreation, water sports, fishing and boating, <br />or just relaxed living. During construction some embankment material <br />was obtained from a ?5-acre tract of land immediateJy downstream of the <br />dam. This excavated area, averaging 12 feet deep, ClUed with water. and <br />formed Lake Hasty, the center of year-round recreation. <br />John Marlin Dam consists of a concrete gravity structure 1,644 feet <br />long and 120 feet high. and an earthfill structure 2.600 feet long. The <br />concrete gravity structure contains a gated spillway provided with <br />sixteen 30 feet by 64 feet tainter gates with their operating machinery. <br />There are earthen wing dams on either side of the main dam. The north <br />wing dam is 3,880 feet long. connecting to the earthfill structure of the <br />main dam at the north abutment. The south wing dam is 5,807 feet long <br />and connects to the south end of lheconcrete structure of the main dam. A <br />bitwninous-surfaced roadway, 21 feet wide, extends along the crest of the <br />north wing dam, main dam, and southwing dam. The overall length of the <br />structure is 2.6 miles. Detailed project data are shown below. <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.