Laserfiche WebLink
<br />I CC1688 <br />I <br /> <br />I TABLE 1 SAN LUIS VALLEY PROJECT DESIGN CONCEPTS <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />DESIGN FEATURE STAGE 1 & 2 STAGE 3 STAGE 4 STAGE 5 TOTALS <br />SALVAGE WELL 13,350 42,940 34,520 14,020 104,830 <br />PRODUCTION IN <br />ACRE FEET PER <br />YEAR <br />NUMBER OF 58 45 42 25 170 <br />SALVAGE WELLS <br />AVERAGE WELL 143 591 509 348 382 <br />CAPACITY IN GPM <br />needed to obtain <br />design yield <br />pumping full-time <br />AVERAGE WELL 167 691 595 406 446 <br />CAPACITY IN GPM <br />pumping 7,500 hr I <br />year to obtain <br />design production <br />RANGE OF WELL 90 -240 200-1090 200-1120 100-620 90-1120 <br />YIELDS IN GPM <br />NUMBER OF 30 16 24 12 82 <br />OBSERVATION <br />WELLS <br />ESTIMATED 2,8 6,3 5,6 2 16,7 <br />ENERGY USAGE <br />IN MILLIONS OF <br />Kwh PER YEAR <br />