My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05878
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05878
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:20:18 PM
Creation date
10/12/2006 1:20:09 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.760
Description
Yampa River General
State
CO
Basin
Yampa/White
Water Division
6
Date
6/1/1993
Title
Progress Reports - Elkhead Feasibility Study - June 1993 through May 1994
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />MEMORANDUM <br /> <br />-.,.,.-...-----.-..- <br />,,~.,,'-..-._^'.,-'- "".~,..,..='....'- <br />jl Dlh I <br />It -,---~~-- <br />SC <br />ASC <br />F <br />I <br />L <br />E <br /> <br /> <br />~~ <br />~'C3>'r <br />~.<~ <br />I....) .--c:,::.:) <br />".:<\ 'iY <br />v>' Jr' <br /> <br />/ <br /> <br />Og~3S5 <br /> <br />TO: Ray Tenney <br />FROM: Chuck Brendecke <br />SUBJECT: Progress Report for April - Yampa Basin Study <br />DATE: May 9.1994 <br /> <br />/ <br /> <br />Our April work effort was directed primarily at Tasks 4, 7, and 8 with lesser efforts ,(. l ' <br />devoted to several other Tasks. <br /> <br />Charges to Task I reflect ongoing project management activities, In April these <br />included several project team meetings devoted to outlining and scheduling work efforts. <br /> <br />Charges to Task 3 reflect completion by Muller Engineering of their remaining data <br />acquisition activities, <br /> <br />Charges to Task 4 reflect work by Muller Engineering to document the reservoir site <br />investigations. I have provided Doug with a preliminary report outline so that his Task 4 <br />Memorandum can be integrated into the final report as conveniently as possible. <br /> <br />Charges to Task 5 reflect startup work by Muller on preliminary project design. <br />Charges to Task 6 reflect analysis of some model results pertaining to the use of the <br />Juniper subordination. <br /> <br />Charges to Task 7 reflect outlining and writing of sections of the Preliminary <br />Environmental Assessment. Ed informs me that we have nearly all the basic information <br />needed for the document and that several sections have been drafted. We are using the Bureau <br />and BLM NEPA compliance documents to guide the structure and content of the Preliminary <br />EA, <br /> <br />Charges to Task 8 reflect outlining and writing of additional material for the draft <br />Preliminary Biological Assessment. <br /> <br />Charges to Task 10 reflect preliminary steps at outlining the final project report as <br />mentioned above, <br /> <br />Charges to Task 11 reflect some time spent by Doug in review his diversion structure <br />materials and discussion about this year's plan for visiting structures. <br /> <br />Tasks 1, 3, and 8 have reached 75 % of their budget allocation and Task 4 has reached <br />97 % of its allocation. In the case of Task 1 and 8 I believe the remaining budgets are <br />sufficient barring unexpected developments in connection with the Biological Assessment. <br />Task 3 is nearly complete. Doug informs me that he is well underway on the writing of the <br />Task 4 Memorandum. ' <br /> <br />Please do not hesitate to call me if you have any questions or comments on our April <br />work effort. <br /> <br />cc: Bob Norman <br />'qlOTlT iI 11 It <br /> <br />Hydrosphere Resource Consultants 1002 Walnut Suite 200 Boulder, Colorado 80302 <br /> <br />j;L o__~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.