My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05878
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05878
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:20:18 PM
Creation date
10/12/2006 1:20:09 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.760
Description
Yampa River General
State
CO
Basin
Yampa/White
Water Division
6
Date
6/1/1993
Title
Progress Reports - Elkhead Feasibility Study - June 1993 through May 1994
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />DIR , <br /> ., <br />SC <br />ASC <br />F <br />I <br />L <br />E <br /> <br />MEMORANDUM <br /> <br />It /01 Ray Tenney <br />FROM: Chuck Brendecke <br />SUBJECT: Progress Report for September - Elkhead Enlargement Study <br />DATE: October 7. 1993 <br /> <br />Our work effort in September was mainly directed at Tasks 4 and 6. <br /> <br />In Task 4, the geOtechnical and geophysical reports are nearing completion. Some <br />supplemental test pits were dug to examine additional sources of borrow material and site <br />surveying of boring locations and downstream channel cross-sections was completed. We have <br />not yet encountered any information which would indicate significant engineering obstacles to <br />enlargement of the dam and reservoir. <br /> <br />Doug informs me that he has received the CADD files of the new mapping from ITS and <br />has gotten them up on their (Muller's) system. The mylars have not yet been delivered. <br /> <br />In Task 6, we prepared additional model runs addressing the contemplated draft of the <br />Juniper water rights and hydrologic conditions associated with the Environmental Baseline. <br />These results were discussed at a Technical Steering Group meeting at Hydrosphere on <br />September 18th. A summary of that TSG meeting is enclosed. Further model runs are <br />currently being held up pending resolution of certain water rights and operational issues related <br />to Stagecoach Reservoir that were raised at that meeting. Bill Miller has also conducted some <br />field investigations at Elkhead to begin setting up his reservoir fishery model. <br /> <br />We will need to finalize the Contemplated Draft and Environmental Baseline <br />assumptions before we can proceed with detailed reservoir operating studies. Now that the <br />mapping is in hand, these assumptions will probably become the critical path items. <br /> <br />Please feel free to call if you have any questions or comments on our September work <br />effort. <br /> <br />cc: Bob Norman <br />\ BiIl'Sl!i\iitblf:' <br /> <br />Hydrosphere Resource Consultants 1002 Walnut Suite 200 Boulder, Colorado 80302 <br /> <br />Q:\PROJeCT6l19JlOO1IPROORESSIl,JNnTUC ~RE...rEO: CCTOIlE'R 7. 1993 B:n AM PR""TEO: 00<0... 1. 'U) (I,U AM <br /> <br />;1,. ." <br />
The URL can be used to link to this page
Your browser does not support the video tag.