My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05851
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05851
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:20:11 PM
Creation date
10/12/2006 1:19:12 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.500.20
Description
Glenwood-Dotsero Springs Unit - Salinity Control Projects - Cogeneration and Desalination
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
10/1/1989
Title
New Articles/Press Releases re: Glenwood Springs Cogeneration/ Desalination Project October 1989 - March 1990
Water Supply Pro - Doc Type
News Article/Press Release
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />(l') <br />.-4 <br />r- <br />~ <br /> <br />,~ <br />,-- <br />c <br /> <br />Bureau of ReClamat. <br /> <br />~=.- - /ff; <br /> <br /> <br />-- -- <br />- -~n"uO WArr("-........"...". rIIIIIIII/A",,""""'" <br />JNSERVATlON .... <br />qn.a e", 11IIIIIIII 11IIIIIIII <br /> <br />News Release <br /> <br />Upper Colorado Region <br /> <br /> <br />Grand Junction Projects Office <br />Grand Junction CO <br />Richard Long (303) 248-0645 <br />For Immediate Release <br /> <br />BUREAU OF RECLAMATION SCHEDULES <br />PUBLIC MEETING ON PROPOSED DESALINATION/POWER GENERATION FACILITY <br /> <br />The Bureau of Reclamation (Reclamation) and the partnership of Oasis Energy / <br />Company and Crystal Energy Company (the Sponsors) have scheduled a public <br />meeting on a study that could lead to the development of a privately financed, <br />owned, and operated desalination/power generation facility in Glenwood <br />Springs, Colorado. The meeting will be Thursday, November 2 at 7:00 p.m. at <br />the Holiday Inn in Glenwood Springs. At the meeting, the Sponsors will ~ <br />describe the project and Reclamation will elicit from the public, significant <br />concerns and issues to be addressed in an Environmental Assessment which <br />Reclamation is preparing on the proposed facility. <br /> <br />The proposed project, consisting of a power generation facility fueled by ~ <br />natural gas, a saline spring collection system, brine desalination plant, and <br />a salt-disposal facility, would be constructed adjacent to 1-70 at Devereux <br />Road. The facility would collect and remove up to 70,000 tons of salt per <br />year from saline springs in the Glenwood Springs area which are contributing <br />approximately 174,000 tons of salt annually to the Colorado River. <br /> <br />The project's power generation facility would produce and sell about 25 MW of <br />power to Public Service Company of Colorado under an existing power purchase <br />contract. Saline spring water would be collected from springs along the <br />Colorado River. Waste heat from power generation would drive a closed <br />evaporative desalination system to remove the salt. The removed salt would be <br />marketed by the Sponsors. The distilled water produced by desalination would <br />be returned to the Colorado River. <br /> <br />A cooperative agreement was signed on October 23, marking the beginning of a <br />joint venture between Reclamation and the Sponsors to lower salinity levels in <br />the river as a part of the Colorado River Water Quality Improvement Program. <br /> <br />For more information about the project, please call Mike Baker at the Bureau <br />of Reclamation in Grand Junction, Colorado, (303) 248-0637. <br /> <br />II II II <br />
The URL can be used to link to this page
Your browser does not support the video tag.