My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05843
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05843
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:20:09 PM
Creation date
10/12/2006 1:19:07 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8541
Description
San Luis Valley Project
State
CO
Basin
Rio Grande
Water Division
3
Date
11/1/1960
Title
Monthly Report
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.') <br /> <br />-,~ !.'! <br /> <br />!.I "; ~,1""" <br /> <br />AODRII!:SS REPLY TOt <br />PROJECT ENGINEER <br /> <br />UNITED STATES <br />DEPARTMENT OF THE INTERIOR <br /> <br />BUREAU OF RECLAMATION <br />SAN LUIS VALLEY PROJECT <br /> <br />f' '~-' <br />v j' " <br /> <br />. - ","'i'\'! <br />. ';:~ '(~ - '< ~.'~ ~~,-"Ji. ~t <br />. - ,. {1 - ,1;'i <br />.. , <br /> <br />MONTE VISTA, COLORADO <br /> <br />,- <br />':.., <br /> <br />""'J" <br />,').::.t <br /> <br />December 1, 1960 <br /> <br />i.~:]~. i ',/ ;~':" l.,~ <br /><~'^ q,." h~i\) <br />,tOllS~'"'''' " . <br /> <br />Monthly Report <br />November 1960 <br /> <br />Rio Grande Division <br /> <br />There were no activities in connection with this Division <br /> <br />during November. <br /> <br />Closed Basin Divisioa <br /> <br />The report. by the Fish and Wildlife Service was reviewed <br /> <br />and comments furnished the Regional Office. An estimate <br /> <br />of the ground water table fluctuation during 1960 was fur- <br /> <br />nished by Mr. D. M. Mathias, Special Deputy State Engineer. <br /> <br />It is apparent that an average drop of 1.9 feet occurred. <br /> <br />Coneios Division <br /> <br />On the evening of November 6, a release of water was start- <br /> <br />ed from Platoro Reservoir at the request of Mr. J. E. Whitten, <br /> <br />State Engineer and Rio Grande Compact Commissioner for <br /> <br />Colorado. The release, 7,500 acre feet, was completed at <br /> <br />10:15 A. M. November 14. The release was made at an aver- <br /> <br />age rate of about 500 c.f.s. Following the release 4,000 <br /> <br />acre feet remained in storage in Platoro Reservoir. This <br /> <br />amount will be retained through the winter months, the in- <br /> <br />flow being passed through the reservoir. <br /> <br />yo- ...'". ... ' ~, <br />:..J .. ...~_ '.1 .... I"J <br />
The URL can be used to link to this page
Your browser does not support the video tag.