My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05838
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05838
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:20:08 PM
Creation date
10/12/2006 1:18:39 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8141.600.20
Description
Fryingpan-Arkansas Project - Studies - Environmental Studies
State
CO
Basin
Arkansas
Water Division
5
Date
4/16/1975
Author
US DoI BoR
Title
Final Environmental Impact Statement Supplement, Part II
Water Supply Pro - Doc Type
EIS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.. <br /> <br />..~~\ <br />'~~ <br />~, ~ ~ <br />. . . <br /> <br />5421\ DEPARTMENT OF THE ARMY <br />ALBUQUERQUE DISTRICT. CORPS OF ENGINEERS <br />P. 0, BOX 1580 <br />ALBUQUERQUE. NEW MEXICO 87103 <br /> <br />. <br /> <br />~6 Decemb~ 1977 <br /> <br />.' <br /> <br />L.;., r.o -.. <br /> <br />Mr. Joe D. Hall <br />Regional Director <br />lluxeau of Reclamation <br />P.O. Box 25247 <br />Denver, CO 80225 <br /> <br />DEC::~;~ii <br /> <br /> <br />Dear "'.r. Ball: <br /> <br />Reference your letter dated 30 November 1977 regarding the proposed <br />construction of the Fountain Valley Conduit. <br /> <br />Regulations published on 19 July 1977 describe a nation~ide permit for <br />discharges of dredged or fill material that are placed as backfill or <br />bedding for utility line crossings, provided there is no change in pre- <br />construction bottom contours. A smomary of the provisions of this <br />permi-c; is inclosed for you:r infcrmation. <br /> <br />. <br /> <br />Ii <br />I <br />, <br /> <br />The Fountain Valley Conduit can be constructed under authority of the <br />'nationwide permit provided all conditions are complied with. <br /> <br />No reports or statements of intent are required to use the nation...ide <br />permit.' The only requirement is that the officer responsible for t.'te <br />project insure that all conditions of the pe=it are complied with. We <br />will continue, however, ,to provide letters of dete=ination on request. <br /> <br />I: <br /> <br />Should you have any questions regarding these <br />not hesitate to write or call Mr. MaX Feld or <br />(50S) 766-2776. <br /> <br />regulations, please do <br />"'.r. Andrew Rosenau at <br />I <br /> <br />I': <br /> <br />S~y yo~s, -I). ;j/J <br />~' ' 0;. ~~ <br />t /L.......,.-,...c:, \ <br />- <br /> <br />I: <br /> <br />1 Inol <br />As stated <br /> <br />RICHARD D. BLUM <br />Chief, ConstrUction- <br />Operations Division <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.