<br />The cost of right of way and lands and net construction costs
<br />of the principal features after applying salvage credits, grants
<br />in aid of construction, and miscellaneous items, are given in
<br />table 2.
<br />
<br />TABLf. 2
<br />
<br />PRINCIPAL MAIN AQlJ!;UUCT FEATURES
<br />
<br />Initial COlIlSlruclion
<br />
<br />June 30, 1945
<br />
<br />NET
<br />CONSTRUCTJO....
<br />COST
<br />
<br />FEATURE.
<br />
<br />Right of way, lands, and t'asem~llls...
<br />Roads m.,mum .._m........__.......
<br />ConSlrucliun walel:' system...
<br />Construction power ~yslem
<br />Parker Dam .....................
<br />Tunnels, concrele lined_...
<br />Cut.and.covt"r comluits .
<br />Concrete lined canals.
<br />Unlined canal .........
<br />Siphl)ns m....__
<br />Telephone lines.
<br />Transmission lines
<br />Pumping plants and camps.
<br />Miscellaneous structures
<br />Reservoirs, Gene and CfJppcr Bo~in...
<br />
<br />153 miles
<br />180 Illilt:s
<br />477 miles
<br />
<br />$ ],32.,683.0.\
<br />1,057,00l.45
<br />704.,SI4.fl'J
<br />709,752. I7
<br />7,218,774.29'
<br />68,500,687.91
<br />14,]]5,469.66
<br />7,7M,7ll.52
<br />143.324.37
<br />9,828,207.89
<br />337,896.39
<br />2,71.5,274.0:r
<br />15,803,442.38
<br />1,228,238.19
<br />1,056,51-8.2.1
<br />
<br />92.09 miles
<br />5--1-,45 miles
<br />62.81 miles
<br />1.05 miles
<br />28.53 miles
<br />430 miles
<br />240 miles
<br />
<br />Jlndud~.s $600,1)01) gr.1~1! trem Fublic \\'orks r\dlTlil1i~t'atiun,
<br />~Includes $253.21)1,37 [or gruund w;n:~ furnished by Drfense Plant c.-'II'('l~tIOII ;I~ l'(,n~i'~~:;I.
<br />lIOn IOf tral1smission servict: to JbsiC" \Iagnesiunl, Tm'.
<br />
<br />Pumping plants
<br />
<br />In the previous fiscal year, 1943-44, the pumping plants had
<br />been operated continuously from February 22 to March 22, 1944
<br />increasing stored water in Lake Mathews to 83.263 acre ftl>t.
<br />This period was arranged in cooperation with the Pacific South-
<br />west Power Interchange Committee so as to cau~e least incon-
<br />venience tn electric power consuming war plants and indugtries
<br />in the southwest area. No further delivery was made to Lake
<br />Mathews between March 22 and August 19, 1944_ Beginning
<br />in August and continuing to December the pumps were oper-
<br />ated about two weeks each month to replenish Lake Mathews
<br />storage. The low winter demand for water made pumping un-
<br />necessary in the first three months of 1945, but in the last half
<br />of April pumping was resumed and was repeated at intervals
<br />in May and June. The total quantity pumped at the Hayfield
<br />plant in this fiscal year was 38,631 acre feet. During the four
<br />months when no delivery was made to Lake Mathews the pumps
<br />