My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05808
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05808
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:19:58 PM
Creation date
10/12/2006 1:17:36 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.50
Description
CRSP - Power Rates
Basin
Colorado Mainstem
Date
10/1/1985
Author
USDOE/WAPA
Title
Colorado River Storage Project and Participating Projects - Proposed Adjustment of Transmission Rates
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />on line in September 1967, the Morrow Point Powerplant in December 1970, and <br />the Crystal Powerplant in August 1978. The Fontenelle Powerplant of the <br />Seedskadee participating project went on line in May 1968. Following are <br />the projected generating capacities with planned uprating of the generators <br />through replacing stator windings, rotor poles and windings, and by making <br />other electrical and meChanical modifications as needed: <br /> <br /> CAPACITY OF CRSP POWERPLANTS <br />CRSP 1986 1987 1988 <br />Gl en Canyon Powerplant 1,270 1,300 1,300 <br />Flaming Gorge Powerplant 132 132 132 <br />Wayne N. Aspinall Unit - Blue Mesa Powerplant 72 72 96 <br />Wayne N. Aspinall Unit - Morrow Po int <br />Powerp 1 an t 146 146 146 <br />Wayne N. Aspi na 11 Unit - Crystal Powerplant 28 28 28 <br /> Subtotal 1,648 1,678 1,702 <br />Participating Projects <br />Seedskadee Project - Fontenelle Powerplant 0 0 0 <br /> Grand Tota 1 1,648 1,678 1,702 <br /> <br />The capabilities are the maximum amounts that can be generated at each <br />plant with all units operating. It is estimated that the Glen Canyon <br />Powerplant will be uprated by FY 1987 and the Blue Mesa Powerplant by FY <br />1988. <br /> <br />Transmission facilities include a high-voltage transmission grid to <br />deliver power to certain delivery points, to provide interconnections among <br />the plants of the CRSP units and participating projects, and to interconnect <br />with other existing Federal and utility systems. Additional transmission <br />facilities are ,planned in order to improve system reliability, to provide <br />for the accommodation of inadvertent power flows from other systems, to <br />conserve fuel by better coordination of thermal and hydro resources, and to <br />allow delivery of power from the additional generation mentioned above. Map <br />No. 594-400-79 is attached hereto as Exhibit A to show the CRSP powerplants <br />and transmission facilities, as well as other existing principal power <br />systems in the CRSP market area. <br /> <br />IV. HISTORY OF TRANSMISSION RATES <br /> <br />The first CRSP firm transmission rate, $4.50 per kilowatt-year, was <br />established in October 1965. The estimated transmission costs were <br />$8,968,000 at that time, which were comprised of annual amortization and <br />OM&R costs of the planned CRSP transmission system, plus estimated costs to <br />the United States of wheeling over other systems in Utah. The estimated <br />transmission capacity commitments were 1,986.5 MW, which consisted of <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.