Laserfiche WebLink
<br />is further required to prepare and make available for public comment an <br />initial regulatory flexibility analysis to describe the impact of the proposed <br />rule on small entities. In this instance, the rate adjustment for the CRSP <br />relates to non-regulatory services provided by Western at a particular rate. <br />Under 5 U.S.C. Section 601(2), rates or services of particular applicability <br />are not considered "rules. within the meaning of the Act. Since the rate for <br />CRSP power is of limited applicability and is being set in accordance with <br />specific regulations and legislation under particular circumstances no <br />flexibility analysis is required. <br /> <br />IX. PROCEDURES FOR PUBLIC PARTICIPATION IN POWER AND TRANSMISSION RATE <br />ADJUSTMENTS AND EXTENSIONS <br /> <br />Procedures for Public Participation in power and transmission rate <br />adjustments and extensions have been published as 10 CFR Part 903 in the <br />Federal Register at 50 FR 37835 (September 18, 1985). <br /> <br />10 CFR PART 903 <br /> <br />Section 903.1 - Purpose and Scope; Application <br />Section 903.2 - Definitions <br />Section 903.11 - Advance Announcement of Rate Adjustment <br />Section 903.13 - Notice of Proposed Rates <br />Section 903.14 - Consultation and Comment Period <br />Section 903.15 - Public Information Forums <br />Section 903.16 - Public Comment Forums <br />Section 903.17 Informal public meetings for minor rate <br />adjustments <br />Section 903.18 - Revised Proposed Rates <br />Section 903.21 - Completion of rate development: provisional <br />rates <br />Section 903.22 - Final Rate Approval <br />Section 903.23 - Rate Extensions <br /> <br />Authority: Sections 301 (b), 302(a), and 644 of Department of Energy <br />Organization Act Public Law 95-91, (42 U.S.C. 7101 et seq); Section 5 of the <br />Flood Control Act of 1944 (16 U.S.C. 825s); the RecTamation Act of 1902 (43 <br />U.S.C. 372 et seq), as amended, and supplemented by subsequent enactments, <br />particularlY-Section 9(c) of Reclamation Project Act of 1939 (43 U.S.C. <br />485h(c)); and the Acts specifically applicable to individual projects or power <br />systems. Source: 50 FR 37835, September 18, 1985. <br /> <br />Part 903 - POWER AND TRANSMISSION RATES <br /> <br />Subpart A - Procedures for Public Participation in Power and Transmission <br />Rate Adjustments and Extensions for the Alaska, Southeastern, <br />Southwestern, and Western Area Power Administrations. <br /> <br />Section 903.1 - Purpose and Scope; Application <br /> <br />(a) Except as otherwise provided herein, these regulations establish <br />procedures for the development of power and transmission rates by the <br />Administrators of the Alaska, Southeastern, Southwestern, and Western Area <br /> <br />11 <br />