Laserfiche WebLink
<br />SUMMARY (Continued) <br /> <br />{~?:~~ <br /> <br />The canal and lateral lining alternative was formulated by includ- <br />ing several separable and distinct increments which could be con8tructed <br />independent of other increments. Each increment consisted of all canals <br />and lateral8 to be lined in a particular subarea. E8ch increment also <br />was planned to be a logical and practical part of the delivery system <br />such as an entire lateral system and/or a major unbroken segment of <br />canal. E8Ch increment would be large enough to accommodate modern con- <br />struction equipment and practices, to provide for continuity and ease of <br />operation and maintenance, and to enable the determination of salt load- <br />ing attributable to the increment. The recommended plan was formul8ted <br />by eliminating those canal lining increments whose cost effectiveness <br />exceeded the level currently being considered for units of the Colorado <br />River Water QU8lity Improvement Program. <br /> <br />The accomplishments, features, and consequences of the recommended <br />plan and the no-action alternative are summarized in the table on the <br />following page and di8cussed in the following sections. <br /> <br />Recommended plan <br /> <br />Under the recommended plan, 55.5 miles of canals and later8ls in <br />the Uinta Basin Unit area would be concrete lined to reduce seepage and <br />thereby reduce salt loading to the Colorado River by an estimated 21,000 <br />to 30,000 tons per year (adjusted to account for the increase resulting <br />from wildlife mitigation). Because of the uncertainties in some vari- <br />ables used in the hydro"alinity analysis, reasonable ranges for these <br />variables were defined which resulted in a range for the salt 108d re- <br />duction for the unit. This 8alt load reduction would be accomplished <br />at an average cost effectiveness of $88 per ton of salt removed. The <br />reduced canal seepage would also result in an increased water supply to <br />presently irrigated lands of about 16,800 acre-feet of water annually; <br />however, because of its seasonal availability, shortages would be re- <br />duced by only about 4,600 acre-feet. A contractual agreement would be <br />executed with the water users requiring that this water only be used on <br />presently irrigated lands. The plan also provides for mitigation meas- <br />ures to compensate for wildlife habitat losse8 which would occur. <br /> <br />The recommended plan includes concrete lining 43.9 miles of canals <br />and 11. 6 miles of laterals involving nine c8nals in six subareas-- <br />Zimmerman Wash, Pleasant Valley, Gray Mountain, Pahcease, South Fork <br />Dry Gulch, and Purdy-Midview. Nearly 50 percent of the canals and <br />laterals to be lined have capacities of 15 cfs or less. Only about 25 <br />percent are in the 60- to 360-cfs range, and these sections are all p8rt <br />of either the Gray Mountain Canal in the Gray Mountain subarea or the <br />Upper Pleasant Valley Canal in the Pleasant Valley subarea. <br /> <br />wildlife measures would include providing 2,000 acre~feet of water <br />annually to enlarge the Bureau of Land Management P8riette Wetland De- <br />velopment Area by 627 acres to compensate for ripari8n and wetland habi- <br />tat which would be lost as a result of project development. The mitiga- <br />tion plan would also include con8tructing big game bridges and escape <br />ramps along the concrete-lined canals where deer mortality could occur <br /> <br />S-6 <br /> <br />cue 4, 1 <br />