My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05783
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05783
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:19:52 PM
Creation date
10/12/2006 1:16:57 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.106
Description
Animas-La Plata
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
3/1/1976
Title
Animas-La Plata Project
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Southern Ute Reservoir will meet the municipal and industrial water <br /> <br />requirements of the Southern Ute Indians. Should not enough La Plata <br /> <br /> <br />River water be available from the reservoir to meet these requirements, <br /> <br /> <br />additional water will come from Ridges Basin Reservoir (through Ridges <br /> <br /> <br />Basin Pumping Plant, Dry Side Canal and the La Plata River). <br /> <br /> <br />Big Stick Reservoir will supply irrigation water to the La Plata, <br /> <br /> <br />Colorado area above Dry Side Canal and furnish municipal and industrial <br /> <br /> <br />water for Red Mesa and Dry Side. Water from the La Plata River will be <br /> <br />diverted into the reservoir through a small diversion dam and canal. <br />The proposed Animas Power Plant will generate power to be used along <br /> <br />with supplemental purchases from the Colorado River Storage Project to <br /> <br /> <br />provide power for project pumping. A tunnel, located on the first sharp <br /> <br /> <br />bend south of the Tacoma Power Plant, will divert flows from the Animaa <br /> <br /> <br />River to the proposed power plant. Present plans will have the plant <br /> <br /> <br />recessed in the canyon wall so that it will not detract from the area'a <br /> <br />scenery. <br /> <br />Sprinkler irrigation will be used on all project lands. The lateral <br />systems will provide sprinkler pressure at each farm turnout. Pumping <br /> <br />plants will provide this pressure where the ground slope is insufficient <br /> <br />to pressurize the pipeline. Project drainage will also be furnished, where <br /> <br />required, on project land. <br />Fiaheries will be created in the in~ctive pools of Ridges Basin and <br /> <br />Southern Ute Reservoirs. In addition, recreational facilities will be <br /> <br />provided at those reservoira. The fishery and recreation potential of <br /> <br />Big Stick Reservoir has not been evaluated yet. <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.