Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />2473 <br /> <br />Annual Operations and Maintenance Costs (Cont'd) <br /> Cost <br /> Enha Mit Total <br />Dusting and Display areas 0 $9,000 $9,000 <br />Guzzlers 0 2,500 2,500 <br />Brushpiles 0 700 700 <br />Burning 0 2,500 2,500 <br />Cottonwood regeneration 0 2,500 2,500 <br />Riparian food plots 0 4,500 4,500 <br />Fencing 0 2,500 2,500 <br />Signs 0 l,500 l,500 <br />Vehicles 0 l5,000 l5,000 <br />Miscellaneous supplies 0 8,000 8,000 <br />Road and trail system 13,700 22,300 36,000 2.1 <br />Parking lots 3,400 5,600 9,000 2.1 <br />Restrooms 5,700 9,300 l5,000 5/ <br />Total O. M. and R Costs $22,800 $525,500 $548,300 <br /> <br />~/ All cost estimates include labor and materials <br /> <br />2/ Based on a ratio of man-days of hunting and wildlife oriented <br />recreation use in the project area with and without the <br />project, 38 percent of these costs are assigned to <br />enhancement and 62 percent to mitigation. <br /> <br />If you have any questions on the draft management plan, please do <br />not hesitate to call us. <br /> <br />cc: fWS/ES Salt Lake City, UT <br />fWS/HR Denver, CO <br />CDOW, Denver, Fort Collins <br /> <br />11-.,;) Id.l~ <br /> <br />5 <br />