Laserfiche WebLink
<br /> <br />-:} <br /> <br />..~ ) <br />-.J <br />W <br />i'o-~ <br /> <br />SUMMARY <br /> <br />The Flood Control Work Group finds that flood problems exist in <br />the Upper Colorado Region and that substantial flood damage can be <br />expected in the future unless adequate flood damage reduction programs <br />are implemented. It is estimated that the total average annual flood <br />damage in 1965 was $2.8 million, and in the absence of additional damage <br />reduction measures the flood damage will increase to $4.2 million by <br />1980, $6.8 million by 2000, and $10.6 million by 2020. <br /> <br />The future flood damage reduction program consists of non-structural <br />flood plain management measures, utilization of proposed multiple-purpose <br />reservoirs for flood control storage, and construction of other structural <br />flood control works where required. Flood control storage in future <br />multiple-purpose reservoirs and small flood retarding structures would <br />amount to 2,300,000 acre-feet. Other structural measures would include <br />construction of 9 miles of levees and improvement in the flow capacities <br />of 11 miles of channels. Non-structural measures would include improved <br />flood forecasting, dissemination of flood hazard information, flood plain <br />zoning, and other measures by local authorities. Flood damages would also <br />be reduced by land treatment on 7,112,000 acres under watershed management <br />programs. <br /> <br />It is estimated the program presented would reduce the projected <br />average annual flood damage to $3.3 million by 1980, $3.4 million by <br />2000, and $3.8 million by 2020. The damage projections are based on <br />a modification of the OBERS baseline projections referred to as the <br />Regional Interpretation of OBERS (RI-OBERS). OBERS baseline projections, <br />three'State Alternative development levels, and their effect on the flood <br />control program are discussed in Supplement A. <br /> <br />The incremental installation costs of the program are estimsted <br />at $14.8 million, $29.9 million, and $15.1 million in the 1966-1980, <br />1981-2000, and 2001-2020 time frames, respectively. Except for the <br />small detention type reservoirs and levee and channel improvements, <br />these costs do not include the portion of total costs of watershed land <br />treatment and water control facilities related to flood control in water- <br />shed projects. Such costs are included in the overall watershed program <br />costs in Appendix VIII - Watershed Management. <br /> <br />The future flood control plan contained in this appendix is a <br />preliminary or reconnaissance level plan which indicates the seriousness <br />of the flood problem and furnishes possible solutions to these problems. <br />These problems and solutions should be studied in detail followed by <br />timely implementation of appropriate flood damage reduction measures. <br /> <br />i <br />