My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05745
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05745
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:19:42 PM
Creation date
10/12/2006 1:15:04 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.43.A.2
Description
Grand Valley/Orchard Mesa
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
2/1/1999
Title
Evaluation of Fish Passage at the Grand Valley Irrigation Company Diversion Dam on the Colorado River Near Palisade, CO - Draft Report
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Task 2. Deploy automatic radiotelemetry system, monitor movements of <br />radiotagged fish, download and operate radiotelemetry system. <br /> <br />Task 3. Capture sub-adult and adult native fishes: flannelmouth <br />sucker, bluehead sucker, and roundtail chub with <br />electrofishing--implant 1,000 PIT tags between these three <br />native fishes; capture and Floy tag nonnative fishes such as <br />carp, white suckers as encountered. <br /> <br />Task 4. Sample upstream, downstream, and in the immediate vicinity of <br />the GVIC diversion dam with electrofishing to recapture <br />previously PIT and Floy-tagged fish. <br /> <br /> Task 5. Prepare RIP annual progress report. <br /> Task 6. Analyze field data; Prepare final report. <br /> Schedule <br /> Task 1. 3/98~/98 <br /> Task 2. 3/98+9/98 <br /> Task 3. 3/98~/98; 7/98~9/98 <br /> Task 4. 5/98+9/98; 10/98 <br /> Task 5. 10/98~12/98 <br /> Task 6. 11/98~3/99 <br />VIII. FY-99 Work <br /> <br />Deliverables/Due Dates: continue monitoring movements of radiotagged <br />Colorado squawfish with the automated radiotelemetry system; sample <br />upstream of GVIC to Price-Stubb Dam to recapture native and nonnative <br />fish PIT and Floy-tagged in 1998 (10/98); prepare RIP annual progress <br />report (12/98); analyze field data; prepare draft and final report <br />(3/99) <br /> <br />Budget Estimate <br /> <br />Task 4. $10,000 <br />Task 5. $ 2,000 <br />Task 6. $13,200 <br /> <br />All Tasks Combined: <br /> <br />Labor (Salary + benefits for Service <br />employees) <br /> <br />Equipment (includes vehicle/boat use <br />& maintenance; tags) <br /> <br />Other (printing of final report, <br /> <br />7 <br /> <br />$ 20 .700 <br /> <br />$ 1. 000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.