My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05743
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05743
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:19:42 PM
Creation date
10/12/2006 1:15:01 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8141.700
Description
Fryingpan-Arkansas Project - Annual Operating Plans and Reports
State
CO
Basin
Arkansas
Water Division
5
Date
11/1/1981
Author
US DoI BoR
Title
Annual Operating Plan Fryingpan-Arkansas Project Colorado 1981 - 1982
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. . <br /> <br />i382 <br /> <br />. ' <br /> <br />. <br /> <br />F. Storage Contracts <br /> <br />In water year 1981 the project had oontracts with a number of entities <br />for storage of the entities' water in project storage space. ~ are <br />long tenn oontracts---a oontract with CF&I Steel Coq:oration for finn <br />storage for 17,416 acre-feet of replacement storage and 10,000 acre-feet <br />of additional storage, and the High Line Canal Caupany for 10,000 acre- <br />feet. The renaining oontracts listed below are I-year interim contracts <br />for if-and-when storage space as follows: <br /> <br />Entity <br /> <br />M'lximum Storage <br />AutlPrized 1981 <br />(Acre-Feet) <br /> <br />MaXimum Storage <br />Water Year 1981 <br />(Acre-Feet) <br /> <br />Catlin Canal Co. <br />Homestake <br />Board of Water W:>rks, Pueblo <br />Pueblo West M=tropolitan District <br />BeSSEm3I' Irrigation Ditch Co. <br />Lake M=redith Reservoir <br /> <br />3,000 <br />30,000 <br />10,000 <br />250 <br />15,000 <br />8,000 <br /> <br />1,915 <br />25,690 <br />560 <br />241 <br />144 <br />658 <br /> <br />G. Project Water Sales and Deliveries <br /> <br />. <br /> <br />The project rold 25,000 acre-feet of water to the Southeastern Colorado <br />Water Conservancy District during water year 1981. Through the end of <br />Septanber, 15,170 acre-feet had been delivered. The Fryingpan-Arkansas <br />Project water released fram Pueblo Reservoir is shown on Exhibit 7. <br /> <br />H. Reservoir Storage Allocation Data <br /> <br />Table 9 presents the reservoir storage allocation data for the five <br />reservoirs in the Fryingpan-Arkansas Project. <br /> <br />IV. OPERATICN PLAN FOR WATER YEAR 1982 <br /> <br />A. General <br /> <br />The rrost probable oondition of water supply has been oonsidered for use <br />by the available facilities of the Fryingpan-Arkansas Project, according <br />to established operating criteria under assumed oonditions of inflow. <br />Changing oonditions may require adjustments to the proposed operating <br />plan. Forecasts of the April-July runoff will J:;e initiated in February <br />1982 and oontinue during each succeeding IlOnth through May. These <br />forecasts are ba,sed up::m the Soil Conservation Service I s IlOnthl y snow <br />survey, nonrel precipitation for the ranainder of the season, and <br />historic runoff patterns. <br /> <br />. <br /> <br />The contract with Southeastern Colorado Water Conservancy District <br />requires that by April 15 notification J:;e given to the District of the <br />quantity of water that will be available to them. This quantity is in <br />excess of the buildup of storage necessary for minimum FOOls and ~r <br />operation, evaporation, and transportation losses. <br /> <br />15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.