My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05718
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05718
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:19:37 PM
Creation date
10/12/2006 1:14:06 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.101.10.A
Description
Colorado River-Water Projects-Glen Canyon Dam/Lake Powell-Glen Canyon Adaptive Management-AMWG
State
AZ
Basin
Colorado Mainstem
Water Division
5
Date
2/2/2001
Title
AMWG Meeting Attachments-March 3-4 2004-Proposed Public Outreach Program
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />An information subcommittee of the AMWG could work with appropriate public affairs <br />staff to develop a specific plan and coordinate with the full AMWG. <br /> <br />Cost <br /> <br />Varies by level of tasks assigned for support. Could range from several weeks to several <br />total months of staff work - either in one office such as the UC Region Public Affairs <br />Office or spread out between other agencies and participants. <br /> <br />vn CARL HAYDEN VISITOR CENTER DISPLAY RENOVATION PLANS <br /> <br />Reclamation and the National Park Service will undertake a renovation ofthe displays at <br />the Carl Hayden Visitor Center at Glen Canyon Darn, This will involve removing the <br />current aging and outdated displays and developing new ones, The focus of the center <br />relates to the visitor experience at the dam plus providing information for the Glen Canyon <br />National Recreation Area, There is an opportunity and a need to incorporate the Adaptive <br />Management Program message in the new center. Design work will probably begin in FY <br />2002, with construction in FY 2003, It is possible the schedule will shift back one year for <br />both actions <br /> <br />Costs <br /> <br />Unknown at this time. Square footage costs for displays generally vary between a low of <br />$150 a square foot to $400 per square foot. . Planning and design costs typically are 25% <br />of prodllctions costs. There are a number off actors still to be determined before better <br />estimates can be provided, <br /> <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.