Laserfiche WebLink
<br />',. <br /> <br />0:00035, <br /> <br /> <br />'..;.....:...'.:' <br /> <br />.' . ';' .'~', <br />',' . <br /> <br />.,.' '. <br /> <br /> <br />.: ..~ <br /> <br />..'. . :,.:.; " " ;~:':,~' : <br /> <br />.'. ,'.. .... <br /> <br />'.; <br /> <br />LETTER OF UNDERSTANDING <br /> <br />PUEBLO DAM AND RESERVOIR, ARKANSAS RIVER <br />I'UEBLO COUNTY, COLORADO <br /> <br />WHEREAS, Pueblo Dam and Reservoir, Arkansas River, Pueblo County, <br />Colorado, was authorized as part of the Fryingpan-Arkansas Project, <br />Colorado (Public Law 87-390) and is owned and operated by the Bureau of <br />Reclamation a <br /> <br />WHEREAS, Section 7 of the Flood Control Act of 1944 (58 Stat. 890, <br />33 U.S.C. 709) directs the Secretary of the Army to prescribe regulations <br />for the use of storage allocated for flood control and navigation at all <br />reservoirs constructed wholly or in part with Federal funds. <br /> <br />WHEREAS, paragraph 208.11, PART 208 FLOOD CONTROL REGULATIONS, <br />CHAPTER II, Title 33 of the Code of Federal Regulations (41 FR 20401, <br />May 18, 1976) further prescribes the policy and procedure for regulating <br />the use of storage allocated for flood control and navigation purposes at <br />all reservoirs capable of such regulation and constructed wholly or in <br />part with Federal funds provided on the basis of such purposes. <br /> <br />THEREFORE, this Letter of Understanding shall consummate the provi- <br />sions of the 1944 Flood Control Act, Section 7, for Pueblo Dam and Reservoir, <br />Arkansas River, Pueblo County, Colorado. In addition to the responsibilities <br />of the project owner and the Corps of Engineers (hereinafter called the <br />Corps) spelled out in paragraph 208.11, PART 208 FLOOD CONTROL REGULATIONS, <br />CHAPTER II, TITLE 33 CFR it is agreed that: <br /> <br />a. This Letter of Understanding shall not abrogate previous Bureau of <br />Reclamation (hereinafter called the Bureau) commitments for the release of <br />waters stored in the conservation pool. <br /> <br />b. The Bureau, as owner and operator of the project, shall accept the <br />responsibility for the operation and maintenance of the flood control <br />facilities. <br /> <br />c. The Bureau shall perform the physical operation of the flood con- <br />trol fa~ilities for the purpose of regulating flood flow in accordance with <br />the Wat~r Control Diagram. <br /> <br />d. The Bureau shall keep the Corps advised of such reservoir operating <br />data as may be requested to monitor the flood control operation. The mini- <br />mum data required is reservoir storage, inflow, releases and streamflow at <br />control points designated by the Water Control Plan on a daily basis. <br /> <br />e. The Bureau shall be responsible for providing adequate warnings to <br />downstream interests when changes in release of stored floodwaters are made. <br /> <br />~'.}/~.:;~:.::,;::~' .' <br />:..:'.:.\::,:;';>;:::" <br /> <br />':.', <br /> <br />". <br /> <br />...'....' <br />.. <br /> <br />~" . <br /> <br />.. .. <br />,.:' ~ ~ <br />:.:".:: <br /> <br />," " <br /> <br />, ..~:!.' <br /> <br />'~.', ',." <br />,.' <br /> <br />'. .. ~'" <br /> <br />..'" <br /> <br />"',"."'.' <br />". ;~.: .' ' <br /> <br />'. ;, <br /> <br /> <br />.,:. -,:' <br /> <br />"~ . .' <br /> <br />.,' <br /> <br />, . ..,. <br />'1. .~. ,. <br /> <br />"'.' <br />;' .'. ,.: <br /> <br />'.,:: <br /> <br />:' <br /> <br />..,.:. <br /> <br />':' "':', <br />','. <br /> <br />: ~' <br /> <br />L ",_". <br />