Laserfiche WebLink
<br /> SlMlARY OF ALLOCATED COST~-COIDRADO RIVER STORAGE PROJECT AND PARrICIPATIIlG PROJECTS <br />. (Unit--$l,OOO) <br /> Municipal <br /> and <br /> Irrlga.- industrial Flood Recrea- Fish and <br /> Storage project and participating projects tieD Pover vater control Subtotal tiOD v11dl1fegj other Total <br /> Storage project 674,150 <br /> Construction coata lO7,911 565,~68 212 673,491 659 <br /> Reimbursable interest during <br /> construction 4~,909 4~,909 4~,909 <br /> Operation, maintenance, 174 6,108 6,282 6,282 <br /> and replacement cOsts <br /> Participating projects <br /> Paonia, Colo. 7,684 7,756 8 7,764 <br /> Construction costs 72 <br /> Operation, maintenance, and <br /> replacement costs 22 22 1 2~ <br /> Pine River extension, Cola. and N. Mex. <br /> Construction costs 5,486 5,486 5,486 <br /> Operation, maintenance, and <br /> replacement costs 21 21 21 <br /> a:nith Fork, Colo. ~,4~7 ~,4~7 24 ~,461 <br /> Construction costs <br /> Operation, maintenance, and <br /> replacement costs 12 12 12 <br /> Florida, Colo. 7,2~4 7,4ll <br /> Construction costs 125 7,~59 52 <br /> Operation, maintenance, and <br /> replacement coats 16 16 16 <br /> Silt, Colo. <br /> Construction coats ~,5~1 ~,5~1 ~,5~1 <br /> Operation, maintenance, and <br /> replacement costs 12 12 12 <br /> HBIlImOnd, N. Mex. <br /> Construction costs 2,433 2,4~~ 2,4~~ <br /> Operation, maintenance, and <br /> replacement costs 18 18 18 <br />. Central Utah (in! tial phase), Utah ~h, 750 <br /> Construction costs 131,242 49,048 44,419 2,232 226,941 1,552 4TI 234,720 <br /> Reimbursable interest during <br /> construction ~,o62 2,456 5,518 5,518 <br /> Operation, maintenance, and <br /> replac~ent costs 240 490 5~ 78~ 1.87 70 1,040 <br /> Emery CO\Ulty, utah <br /> Construction costs 9,704 9,704 190 9,894 <br /> Operation, maintenance, and <br /> replacement costs 25 25 15 40 <br /> Seedskadee, Wyo. <br /> Construction costs 25,000 25,060 25,000 <br /> Operation, maintenance, and <br /> replacement costs 18~ 18~ 18~ <br /> ~,Wyo. <br /> ConstructiOn costs 1l,~76 ll,376 ll, ~76 <br /> Operation, maintenance, and <br /> replacement costs 62 62 62 <br /> LaBarge, Wyo. <br /> Construction costs 1,751 1,751 1,751 <br /> Operation, maintenance, and <br /> replacement costs 20 20 20 <br /> Subtotal--participating projects <br /> Construction costs 208,9,s 49,048 44,419 2,429 304 ,8~4 l,TI4 529 5,750 ~12,887 <br /> Reimbursable interest during <br /> construction 3,062 2,456 5,518 5,518 <br /> Operation, maintenance, and <br /> replacement costs 6~1 490 5~ 1,174 2O~ 70 1,447 <br /> Total--storage project and partici- <br /> pating projects <br /> Construction costs ~H"849 614,416 44,419 2,641 978, ~25 2,4~~ 529 5,750 987, 0~7 <br /> Reimbursable interest during <br /> construction 46,971 2,456 49,427 49,427 <br /> Operation, maintenance, ~ <br /> re lacement costs 805 6,598 5~ :tJ! 7,456 2O~ 70 7.729 <br /> 1 Allocated construction costs exclude expenditures from contributed funds and Colorado River Development Fund. Interest during construction <br />. am replacement costs are based on interest at rate of 2 7/8 percent. <br /> V Estimated cost of constructing certain features to ultimate phase capacity. <br /> ~ The fisb and wildlife allocation is incomplete because no appraisal of fish and 'J11dJ.ife benef1 ts from the storage project has been made <br /> and benefits from the participating projects have been only partially evaluated. <br /> 43 ..T[lIOI...!CL_A'IONSl.C UTAH <br />