<br /> SlMlARY OF ALLOCATED COST~-COIDRADO RIVER STORAGE PROJECT AND PARrICIPATIIlG PROJECTS
<br />. (Unit--$l,OOO)
<br /> Municipal
<br /> and
<br /> Irrlga.- industrial Flood Recrea- Fish and
<br /> Storage project and participating projects tieD Pover vater control Subtotal tiOD v11dl1fegj other Total
<br /> Storage project 674,150
<br /> Construction coata lO7,911 565,~68 212 673,491 659
<br /> Reimbursable interest during
<br /> construction 4~,909 4~,909 4~,909
<br /> Operation, maintenance, 174 6,108 6,282 6,282
<br /> and replacement cOsts
<br /> Participating projects
<br /> Paonia, Colo. 7,684 7,756 8 7,764
<br /> Construction costs 72
<br /> Operation, maintenance, and
<br /> replacement costs 22 22 1 2~
<br /> Pine River extension, Cola. and N. Mex.
<br /> Construction costs 5,486 5,486 5,486
<br /> Operation, maintenance, and
<br /> replacement costs 21 21 21
<br /> a:nith Fork, Colo. ~,4~7 ~,4~7 24 ~,461
<br /> Construction costs
<br /> Operation, maintenance, and
<br /> replacement costs 12 12 12
<br /> Florida, Colo. 7,2~4 7,4ll
<br /> Construction costs 125 7,~59 52
<br /> Operation, maintenance, and
<br /> replacement coats 16 16 16
<br /> Silt, Colo.
<br /> Construction coats ~,5~1 ~,5~1 ~,5~1
<br /> Operation, maintenance, and
<br /> replacement costs 12 12 12
<br /> HBIlImOnd, N. Mex.
<br /> Construction costs 2,433 2,4~~ 2,4~~
<br /> Operation, maintenance, and
<br /> replacement costs 18 18 18
<br />. Central Utah (in! tial phase), Utah ~h, 750
<br /> Construction costs 131,242 49,048 44,419 2,232 226,941 1,552 4TI 234,720
<br /> Reimbursable interest during
<br /> construction ~,o62 2,456 5,518 5,518
<br /> Operation, maintenance, and
<br /> replac~ent costs 240 490 5~ 78~ 1.87 70 1,040
<br /> Emery CO\Ulty, utah
<br /> Construction costs 9,704 9,704 190 9,894
<br /> Operation, maintenance, and
<br /> replacement costs 25 25 15 40
<br /> Seedskadee, Wyo.
<br /> Construction costs 25,000 25,060 25,000
<br /> Operation, maintenance, and
<br /> replacement costs 18~ 18~ 18~
<br /> ~,Wyo.
<br /> ConstructiOn costs 1l,~76 ll,376 ll, ~76
<br /> Operation, maintenance, and
<br /> replacement costs 62 62 62
<br /> LaBarge, Wyo.
<br /> Construction costs 1,751 1,751 1,751
<br /> Operation, maintenance, and
<br /> replacement costs 20 20 20
<br /> Subtotal--participating projects
<br /> Construction costs 208,9,s 49,048 44,419 2,429 304 ,8~4 l,TI4 529 5,750 ~12,887
<br /> Reimbursable interest during
<br /> construction 3,062 2,456 5,518 5,518
<br /> Operation, maintenance, and
<br /> replacement costs 6~1 490 5~ 1,174 2O~ 70 1,447
<br /> Total--storage project and partici-
<br /> pating projects
<br /> Construction costs ~H"849 614,416 44,419 2,641 978, ~25 2,4~~ 529 5,750 987, 0~7
<br /> Reimbursable interest during
<br /> construction 46,971 2,456 49,427 49,427
<br /> Operation, maintenance, ~
<br /> re lacement costs 805 6,598 5~ :tJ! 7,456 2O~ 70 7.729
<br /> 1 Allocated construction costs exclude expenditures from contributed funds and Colorado River Development Fund. Interest during construction
<br />. am replacement costs are based on interest at rate of 2 7/8 percent.
<br /> V Estimated cost of constructing certain features to ultimate phase capacity.
<br /> ~ The fisb and wildlife allocation is incomplete because no appraisal of fish and 'J11dJ.ife benef1 ts from the storage project has been made
<br /> and benefits from the participating projects have been only partially evaluated.
<br /> 43 ..T[lIOI...!CL_A'IONSl.C UTAH
<br />
|